Kirk Sandall
KKSYorkshire and The HumberManaged by Northern Trains
How this station is performing
Kirk Sandall had 18,069 scheduled stops to Period 7 of 2026-27, about 50 a day. 83.7% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Kirk Sandall opened on 13 May 1991, 35 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Doncaster is the oldest (1848) and Bentley (South Yorkshire) the newest (1992), with Kirk Sandall in between.
The nearest stations to Kirk Sandall are Hatfield and Stainforth (4.4 km north-east), Bentley (South Yorkshire) (5.5 km south-west), Doncaster (6.3 km south-west), Adwick (7.0 km west) and Thorne North (9.0 km north-east). 6 stations lie within 10 km in all. At 83.7%, Kirk Sandall is more punctual than every one of them; the best of the five, Hatfield and Stainforth, manages 82.8%.
Kirk Sandall takes its name from a Village called Kirk Sandall, and the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Kirk Sandall was Period 9 of 2023-24, at 69.9%, some time before the latest year. The strongest was Period 7 of 2026-27, at 88.9%, and the two are 19.0 percentage points apart. Cancellations peaked at 9.3% of scheduled stops in Period 7 of 2023-24, against 2.9% over the latest 13 periods.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Kirk Sandall on 83.7%. The comparison group includes Baildon (90.2%), Hatfield and Stainforth (82.8%) and Barnetby (72.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 17,762 | 84.5% | 2.9% |
| TransPennine Express | 307 | – | – |
Operators with their own page for this station are linked to it.
Late train at Kirk Sandall? Delay Repay
These operators call at Kirk Sandall and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,337 | 88.9% | 2.5% |
| Period 6 of 2026-27 | 1,374 | 87.3% | 2.8% |
| Period 5 of 2026-27 | 1,376 | 86.1% | 2.0% |
| Period 4 of 2026-27 | 1,375 | 82.8% | 7.5% |
| Period 3 of 2026-27 | 1,376 | 85.0% | 3.1% |
| Period 2 of 2026-27 | 1,351 | 82.6% | 2.7% |
| Period 1 of 2026-27 | 1,584 | 87.9% | 1.7% |
| Period 13 of 2025-26 | 1,511 | 88.3% | 1.6% |
| Period 12 of 2025-26 | 1,377 | 87.1% | 1.6% |
| Period 11 of 2025-26 | 1,376 | 82.9% | 3.9% |
| Period 10 of 2025-26 | 1,258 | 81.8% | 2.9% |
| Period 9 of 2025-26 | 1,387 | 70.9% | 3.5% |
| Period 8 of 2025-26 | 1,387 | 75.4% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Baildon | 17,987 | 90.2% | 1.3% |
| Hatfield and Stainforth | 18,374 | 82.8% | 2.9% |
| Barnetby | 18,598 | 72.4% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out