Hatfield and Stainforth
HFSYorkshire and The HumberManaged by Northern Trains
How this station is performing
Hatfield and Stainforth had 18,374 scheduled stops to Period 7 of 2026-27, about 50 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Hatfield and Stainforth opened on 1 July 1856. It was moved to the site it uses now on 1 October 1866. Of the 5 stations nearest to it with a known opening date, Hatfield and Stainforth is the oldest; the next oldest, Thorne South, dates from 1856.
The nearest stations to Hatfield and Stainforth are Kirk Sandall (4.4 km south-west), Thorne North (4.6 km north-east), Thorne South (4.8 km east), Bentley (South Yorkshire) (9.8 km south-west) and Adwick (10.5 km west). 4 stations lie within 10 km in all. Of the five, Thorne South is the most punctual at 84.4% and Bentley (South Yorkshire) the least at 74.5%, with Hatfield and Stainforth on 82.8%.
Hatfield and Stainforth is named after Hatfield, a town, home to about 17,326 people, but the station stands 1.8 km from its centre.
2 operators call at Hatfield and Stainforth: Northern (83.8%, 97% of stops) and TransPennine Express (62.5%, 3% of stops). The operator you travel with matters: Northern reaches 83.8% within three minutes while TransPennine Express manages 62.5%, a gap of 21.3 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Hatfield and Stainforth on 82.8%. The comparison group includes Barnetby (72.4%), Kirk Sandall (83.7%) and Baildon (90.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 17,762 | 83.8% | 2.9% |
| TransPennine Express | 612 | 62.5% | 0.0% |
Operators with their own page for this station are linked to it.
Late train at Hatfield and Stainforth? Delay Repay
These operators call at Hatfield and Stainforth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,361 | 87.6% | 2.6% |
| Period 6 of 2026-27 | 1,398 | 85.1% | 2.6% |
| Period 5 of 2026-27 | 1,399 | 84.4% | 2.1% |
| Period 4 of 2026-27 | 1,399 | 82.5% | 7.4% |
| Period 3 of 2026-27 | 1,400 | 83.6% | 2.6% |
| Period 2 of 2026-27 | 1,368 | 82.1% | 3.1% |
| Period 1 of 2026-27 | 1,612 | 87.4% | 1.7% |
| Period 13 of 2025-26 | 1,537 | 87.4% | 1.8% |
| Period 12 of 2025-26 | 1,400 | 86.3% | 1.6% |
| Period 11 of 2025-26 | 1,400 | 82.3% | 3.9% |
| Period 10 of 2025-26 | 1,278 | 81.3% | 2.8% |
| Period 9 of 2025-26 | 1,411 | 70.7% | 3.8% |
| Period 8 of 2025-26 | 1,411 | 75.0% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barnetby | 18,598 | 72.4% | 2.6% |
| Kirk Sandall | 18,069 | 83.7% | 2.9% |
| Baildon | 17,987 | 90.2% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out