Northern at Kirk Sandall
All trains at Kirk SandallNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 17,762 scheduled stops at Kirk Sandall in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 84.5% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Northern trains at Kirk Sandall also serve Hatfield and Stainforth (4.4 km north-east, 83.8% on time, 2.9% cancelled), Bentley (South Yorkshire) (5.5 km south-west, 74.5% on time, 3.2% cancelled), Doncaster (6.3 km south-west, 83.2% on time, 2.8% cancelled), Adwick (7.0 km west, 76.2% on time, 3.2% cancelled), Thorne North (9.0 km north-east, 79.8% on time, 3.4% cancelled) and Thorne South (9.1 km north-east, 87.9% on time, 1.2% cancelled), which are the stations on its network closest to Kirk Sandall.
Within 30 km of here, Northern runs best at Scunthorpe, 28.1 km east (91.8%), and worst at South Milford, 27.0 km north-west (64.6%).
The busiest Northern station within 30 km of Kirk Sandall is Meadowhall, 27.7 km south-west, with about 246 scheduled stops a day.
Of the 1 operators with enough records at Kirk Sandall, Northern is the most punctual, at 84.5%.
Northern at Kirk Sandall has edged up: 84.5% of stops came within three minutes of the timetable in the latest 13 periods, 2.9 percentage points better than the 81.6% of the 13 before. Cancellations fell to 2.9% of scheduled stops from 3.6%, which is 0.7 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,313 | 89.7% | 2.6% |
| Period 6 of 2026-27 | 1,350 | 88.1% | 2.7% |
| Period 5 of 2026-27 | 1,352 | 86.9% | 2.0% |
| Period 4 of 2026-27 | 1,351 | 83.4% | 7.5% |
| Period 3 of 2026-27 | 1,352 | 85.9% | 3.1% |
| Period 2 of 2026-27 | 1,334 | 83.0% | 2.4% |
| Period 1 of 2026-27 | 1,556 | 88.7% | 1.7% |
| Period 13 of 2025-26 | 1,486 | 88.7% | 1.5% |
| Period 12 of 2025-26 | 1,353 | 88.2% | 1.6% |
| Period 11 of 2025-26 | 1,352 | 83.8% | 4.0% |
| Period 10 of 2025-26 | 1,237 | 82.3% | 2.9% |
| Period 9 of 2025-26 | 1,363 | 71.9% | 3.5% |
| Period 8 of 2025-26 | 1,363 | 76.1% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Kirk Sandall
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 307 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out