Barnetby
BTBYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Barnetby had 18,598 scheduled stops to Period 7 of 2026-27, about 51 a day. 72.4% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Barnetby opened on 1 November 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barnetby is the oldest; the next oldest, Brigg, dates from 1848.
The nearest stations to Barnetby are Brigg (5.8 km south-west), Ulceby (8.7 km north-east), Habrough (9.9 km east), Thornton Abbey (10.5 km north-east) and Goxhill (12.3 km north-east). 3 stations lie within 10 km in all. At 72.4%, Barnetby is less punctual than all of them; the best of the five, Ulceby, manages 77.4%.
Barnetby is named after Barnetby le Wold, a Village, home to about 1,842 people, but the station stands 0.4 km from its centre.
3 operators call at Barnetby: TransPennine Express (68.2%, 64% of stops), East Midlands Railway (81.2%, 33% of stops) and Northern (–, 3% of stops). The operator you travel with matters: East Midlands Railway reaches 81.2% within three minutes while TransPennine Express manages 68.2%, a gap of 13.0 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Barnetby is the least punctual, at 72.4%. All of them are ahead, including Hatfield and Stainforth (82.8%), Kirk Sandall (83.7%) and Baildon (90.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 11,891 | 68.2% | 3.0% |
| East Midlands Railway | 6,183 | 81.2% | 1.9% |
| Northern | 524 | – | – |
Operators with their own page for this station are linked to it.
Late train at Barnetby? Delay Repay
These operators call at Barnetby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,411 | 75.0% | 1.3% |
| Period 6 of 2026-27 | 1,424 | 76.2% | 2.5% |
| Period 5 of 2026-27 | 1,420 | 68.9% | 4.9% |
| Period 4 of 2026-27 | 1,435 | 71.5% | 2.7% |
| Period 3 of 2026-27 | 1,430 | 69.0% | 2.0% |
| Period 2 of 2026-27 | 1,198 | 71.1% | 4.1% |
| Period 1 of 2026-27 | 1,647 | 74.9% | 2.1% |
| Period 13 of 2025-26 | 1,573 | 78.1% | 1.2% |
| Period 12 of 2025-26 | 1,422 | 78.0% | 1.8% |
| Period 11 of 2025-26 | 1,427 | 74.8% | 2.2% |
| Period 10 of 2025-26 | 1,311 | 72.8% | 3.0% |
| Period 9 of 2025-26 | 1,444 | 61.0% | 2.5% |
| Period 8 of 2025-26 | 1,456 | 68.5% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hatfield and Stainforth | 18,374 | 82.8% | 2.9% |
| Kirk Sandall | 18,069 | 83.7% | 2.9% |
| Baildon | 17,987 | 90.2% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out