Dingwall
DINScotlandManaged by ScotRail
How this station is performing
Dingwall had 8,760 scheduled stops to Period 7 of 2026-27, about 24 a day. 87.1% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Dingwall opened on 11 June 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dingwall is the oldest; the next oldest, Muir of Ord, dates from 1862.
The nearest stations to Dingwall are Conon Bridge (3.8 km south), Muir of Ord (8.8 km south), Beauly (13.2 km south), Alness (15.2 km north-east) and Garve (16.0 km west). 2 stations lie within 10 km in all. At 87.1%, Dingwall is less punctual than all of them; the best of the five, Muir of Ord, manages 89.2%.
Dingwall takes its name from a town called Dingwall, home to about 5,470 people, and the station stands 0.5 km from its centre.
Dingwall improved sharply over the past year. In the latest 13 periods 87.1% of stops came within three minutes of the timetable, up 6.6 percentage points from 80.5% in the 13 before. Cancellations fell to 2.7% of scheduled stops from 3.7%, which is 1.0 percentage points fewer.
1 of 3 stations of a similar size in Scotland are more punctual than Dingwall on 87.1%. The comparison group includes East Linton (77.3%), Muir of Ord (89.2%) and Aviemore (71.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 8,760 | 87.1% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Dingwall? Delay Repay
These operators call at Dingwall and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 682 | 80.3% | 3.1% |
| Period 6 of 2026-27 | 684 | 89.9% | 4.1% |
| Period 5 of 2026-27 | 686 | 90.4% | 2.8% |
| Period 4 of 2026-27 | 683 | 89.6% | 2.6% |
| Period 3 of 2026-27 | 627 | 92.8% | 0.8% |
| Period 2 of 2026-27 | 684 | 91.9% | 2.0% |
| Period 1 of 2026-27 | 783 | 90.4% | 1.4% |
| Period 13 of 2025-26 | 738 | 89.3% | 2.2% |
| Period 12 of 2025-26 | 680 | 91.8% | 2.8% |
| Period 11 of 2025-26 | 624 | 82.8% | 3.8% |
| Period 10 of 2025-26 | 573 | 86.7% | 4.4% |
| Period 9 of 2025-26 | 673 | 80.3% | 4.2% |
| Period 8 of 2025-26 | 643 | 75.0% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Linton | 8,771 | 77.3% | 1.3% |
| Muir of Ord | 8,743 | 89.2% | 2.7% |
| Aviemore | 8,654 | 71.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out