LNER at Kingussie

All trains at KingussieLNER across BritainScotland

On time, last 13 periods59.2%Whole station: 61.0%
Cancelled0.7%Whole station: 1.3%
Scheduled stops710Of 8,654 at the station

How this operator is doing here

LNER had 710 scheduled stops at Kingussie in the 13 periods to Period 7 of 2026-27, 8% of the station's total. 59.2% of recorded arrivals came within three minutes and 0.7% of stops were cancelled.

LNER trains at Kingussie also serve Newtonmore (4.5 km south-west, – on time, – cancelled), Aviemore (18.3 km north-east, 68.0% on time, 0.7% cancelled), Carrbridge (26.2 km north-east, – on time, – cancelled), Blair Atholl (36.9 km south, – on time, – cancelled), Inverness (45.9 km north, 79.2% on time, 0.7% cancelled) and Pitlochry (46.0 km south-east, 57.3% on time, 0.7% cancelled), which are the stations on its network closest to Kingussie.

The busiest LNER station within 30 km of Kingussie is Aviemore, 18.3 km north-east, with about 2 scheduled stops a day.

Of the 2 operators with enough records at Kingussie, LNER is the least punctual, at 59.2%.

LNER cancels fewer trains at Kingussie than elsewhere: 0.7% of scheduled stops, against 2.9% across its network and 1.3% for every operator at the station.

LNER at Kingussie has slipped sharply. 59.2% of stops came within three minutes of the timetable in the latest 13 periods, 8.7 percentage points worse than the 67.9% recorded in the 13 before. Cancellations held steady at 0.7% of scheduled stops, against 0.3% before.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 76.8%Period 13 of 2023-24: 66.1%Period 4 of 2024-25: 77.4%Period 8 of 2024-25: 51.8%Period 12 of 2024-25: 67.9%Period 13 of 2024-25: 78.3%Period 2 of 2025-26: 69.6%Period 3 of 2025-26: 75.0%Period 4 of 2025-26: 55.4%Period 6 of 2025-26: 76.4%Period 12 of 2025-26: 67.3%Period 13 of 2025-26: 69.4%Period 1 of 2026-27: 55.0%Period 2 of 2026-27: 57.1%Period 3 of 2026-27: 64.3%Period 4 of 2026-27: 50.0%Period 6 of 2026-27: 53.6%Period 7 of 2026-27: 56.4%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.8%Period 13 of 2023-24: 1.8%Period 4 of 2024-25: 5.4%Period 8 of 2024-25: 0.0%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 0.0%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.0%Period 6 of 2025-26: 1.8%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 3.2%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 6 of 2026-27: 0.0%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275656.4%0.0%
Period 6 of 2026-275653.6%0.0%
Period 5 of 2026-2755––
Period 4 of 2026-275650.0%0.0%
Period 3 of 2026-275664.3%0.0%
Period 2 of 2026-275657.1%0.0%
Period 1 of 2026-276255.0%3.2%
Period 13 of 2025-266269.4%0.0%
Period 12 of 2025-265667.3%1.8%
Period 11 of 2025-2653––
Period 10 of 2025-2646––
Period 9 of 2025-2655––
Period 8 of 2025-2641––

Other operators at Kingussie

OperatorScheduled stopsWithin 3 minCancelled
ScotRail7,32660.5%1.1%
Caledonian Sleeper618––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out