Kingston
KNGLondonManaged by South Western Railway
How this station is performing
Kingston had 51,321 scheduled stops to Period 7 of 2026-27, about 141 a day. 85.1% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Kingston opened on 1 July 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Surbiton is the oldest (1838) and Berrylands the newest (1933), with Kingston in between.
The nearest stations to Kingston are Hampton Wick (0.8 km west), Norbiton (1.2 km east), Berrylands (2.1 km south-east), Surbiton (2.3 km south) and Teddington (2.5 km north-west). 63 stations lie within 10 km in all. Of the five, Hampton Wick is the most punctual at 88.3% and Surbiton the least at 82.9%, with Kingston on 85.1%.
Kingston is named after Kingston upon Thames, an area of London, home to about 43,013 people, but the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Kingston was Period 9 of 2024-25, at 57.6%, some time before the latest year. The strongest was Period 2 of 2023-24, at 94.6%, and the two are 37.0 percentage points apart. Cancellations peaked at 12.0% of scheduled stops in Period 1 of 2025-26, against 5.3% over the latest 13 periods.
2 of 3 stations of a similar size in London are more punctual than Kingston on 85.1%. The comparison group includes Coulsdon South (78.5%), Harlesden (92.3%) and Hatch End (87.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 51,321 | 85.1% | 5.3% |
Operators with their own page for this station are linked to it.
Late train at Kingston? Delay Repay
These operators call at Kingston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,813 | 89.1% | 3.8% |
| Period 6 of 2026-27 | 3,901 | 88.9% | 4.6% |
| Period 5 of 2026-27 | 3,941 | 86.7% | 3.4% |
| Period 4 of 2026-27 | 4,012 | 87.9% | 3.1% |
| Period 3 of 2026-27 | 4,107 | 85.7% | 8.4% |
| Period 2 of 2026-27 | 4,301 | 82.4% | 8.4% |
| Period 1 of 2026-27 | 4,502 | 89.5% | 3.6% |
| Period 13 of 2025-26 | 3,945 | 90.6% | 2.4% |
| Period 12 of 2025-26 | 3,405 | 83.4% | 8.8% |
| Period 11 of 2025-26 | 4,044 | 85.5% | 3.7% |
| Period 10 of 2025-26 | 3,695 | 84.1% | 5.4% |
| Period 9 of 2025-26 | 3,981 | 73.1% | 4.9% |
| Period 8 of 2025-26 | 3,674 | 77.0% | 8.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Coulsdon South | 51,232 | 78.5% | 5.1% |
| Harlesden | 51,431 | 92.3% | 2.9% |
| Hatch End | 51,431 | 87.0% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out