Coulsdon South
CDSLondonManaged by Govia Thameslink Railway (Southern)
How this station is performing
Coulsdon South had 51,232 scheduled stops to Period 7 of 2026-27, about 141 a day. 78.5% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Coulsdon South opened on 1 August 1923, 103 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Kenley is the oldest (1856) and Woodmansterne the newest (1932), with Coulsdon South in between.
The nearest stations to Coulsdon South are Coulsdon Town (0.8 km north), Woodmansterne (1.2 km west), Reedham (London) (2.0 km north-east), Chipstead (2.3 km west) and Kenley (2.7 km east). 45 stations lie within 10 km in all. Of the five, Woodmansterne is the most punctual at 83.9% and Kenley the least at 66.9%, with Coulsdon South on 78.5%.
Coulsdon South is named after Coulsdon, an area of London, home to about 25,695 people, but the station stands 0.6 km from its centre.
Cancellations are a particular problem at Coulsdon South. 5.1% of scheduled stops did not happen, 1.9 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2131st of 2,374.
Compared with 3 stations of a similar size in London, Coulsdon South is the least punctual, at 78.5%. All of them are ahead, including Kingston (85.1%), Harlesden (92.3%) and Hatch End (87.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 51,232 | 78.5% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Coulsdon South? Delay Repay
These operators call at Coulsdon South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,920 | 77.9% | 5.4% |
| Period 6 of 2026-27 | 3,932 | 74.0% | 4.7% |
| Period 5 of 2026-27 | 4,010 | 71.0% | 6.6% |
| Period 4 of 2026-27 | 4,061 | 76.2% | 6.5% |
| Period 3 of 2026-27 | 3,783 | 76.2% | 4.9% |
| Period 2 of 2026-27 | 3,911 | 83.7% | 4.9% |
| Period 1 of 2026-27 | 4,490 | 86.4% | 3.2% |
| Period 13 of 2025-26 | 4,322 | 85.2% | 2.5% |
| Period 12 of 2025-26 | 4,023 | 78.4% | 3.8% |
| Period 11 of 2025-26 | 3,331 | 75.9% | 4.4% |
| Period 10 of 2025-26 | 3,461 | 80.5% | 5.1% |
| Period 9 of 2025-26 | 3,982 | 72.2% | 8.8% |
| Period 8 of 2025-26 | 4,006 | 80.7% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out