Kenton
KNTLondonManaged by London Underground
How this station is performing
Kenton had 51,431 scheduled stops to Period 7 of 2026-27, about 141 a day. 86.5% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Kenton opened on 15 June 1912, 114 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Harrow and Wealdstone is the oldest (1837) and South Kenton the newest (1933), with Kenton in between.
The nearest stations to Kenton are Harrow-on-the-Hill (1.4 km west), South Kenton (1.4 km south-east), Harrow and Wealdstone (1.7 km north-west), North Wembley (2.3 km south-east) and Sudbury Hill Harrow (2.9 km south-west). 44 stations lie within 10 km in all. Of the five, Sudbury Hill Harrow is the most punctual at 90.2% and Harrow and Wealdstone the least at 83.5%, with Kenton on 86.5%.
Kenton is one of 6 stations named after an area of London called Kenton, home to about 35,600 people; this one stands 0.9 km from its centre.
Compared with 3 stations of a similar size in London, Kenton is the least punctual, at 86.5%. All of them are ahead, including Harlesden (92.3%), Hatch End (87.0%) and Headstone Lane (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 51,431 | 86.5% | 2.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,986 | 85.6% | 1.6% |
| Period 6 of 2026-27 | 3,879 | 85.1% | 5.0% |
| Period 5 of 2026-27 | 3,769 | 88.7% | 4.8% |
| Period 4 of 2026-27 | 4,051 | 82.0% | 2.7% |
| Period 3 of 2026-27 | 3,930 | 84.7% | 2.3% |
| Period 2 of 2026-27 | 3,901 | 87.6% | 3.6% |
| Period 1 of 2026-27 | 4,074 | 87.2% | 1.8% |
| Period 13 of 2025-26 | 4,356 | 88.7% | 1.3% |
| Period 12 of 2025-26 | 3,907 | 86.5% | 2.4% |
| Period 11 of 2025-26 | 4,032 | 86.5% | 2.7% |
| Period 10 of 2025-26 | 3,734 | 86.3% | 2.8% |
| Period 9 of 2025-26 | 3,764 | 85.9% | 4.0% |
| Period 8 of 2025-26 | 4,048 | 90.1% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Harlesden | 51,431 | 92.3% | 2.9% |
| Hatch End | 51,431 | 87.0% | 3.3% |
| Headstone Lane | 51,431 | 87.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out