Hull
HULYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Hull had 72,948 scheduled stops to Period 7 of 2026-27, about 200 a day. 78.3% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Hull opened on 8 May 1848, 178 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hessle is the oldest (1840) and Barrow Haven the newest (1849), with Hull in between.
The nearest stations to Hull are New Holland (4.7 km south), Cottingham (5.7 km north-west), Barrow Haven (6.0 km south-west), Hessle (6.9 km south-west) and Goxhill (7.5 km south). 6 stations lie within 10 km in all. Of the five, Hessle is the most punctual at 80.6% and Goxhill the least at 72.4%, with Hull on 78.3%.
4 operators call at Hull: Northern (77.4%, 74% of stops), TransPennine Express (84.6%, 18% of stops), Hull Trains (71.6%, 7% of stops) and LNER (79.3%, 1% of stops). The operator you travel with matters: TransPennine Express reaches 84.6% within three minutes while Hull Trains manages 71.6%, a gap of 13.0 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Hull is the most punctual, at 78.3%. The comparison group includes Halifax (71.7%), Wakefield Westgate (66.0%) and Brough (72.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 54,207 | 77.4% | 2.8% |
| TransPennine Express | 13,187 | 84.6% | 2.0% |
| Hull Trains | 4,889 | 71.6% | 0.6% |
| LNER | 665 | 79.3% | 5.6% |
Operators with their own page for this station are linked to it.
Late train at Hull? Delay Repay
These operators call at Hull and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,562 | 76.0% | 1.4% |
| Period 6 of 2026-27 | 5,588 | 80.1% | 2.6% |
| Period 5 of 2026-27 | 5,504 | 79.1% | 3.3% |
| Period 4 of 2026-27 | 5,642 | 77.9% | 4.4% |
| Period 3 of 2026-27 | 5,520 | 80.6% | 2.3% |
| Period 2 of 2026-27 | 5,611 | 79.0% | 2.1% |
| Period 1 of 2026-27 | 6,447 | 84.0% | 1.9% |
| Period 13 of 2025-26 | 6,135 | 85.1% | 2.0% |
| Period 12 of 2025-26 | 5,454 | 82.4% | 1.3% |
| Period 11 of 2025-26 | 5,424 | 79.6% | 3.3% |
| Period 10 of 2025-26 | 5,007 | 76.2% | 2.6% |
| Period 9 of 2025-26 | 5,534 | 64.5% | 3.6% |
| Period 8 of 2025-26 | 5,520 | 71.8% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Halifax | 67,403 | 71.7% | 3.7% |
| Wakefield Westgate | 79,855 | 66.0% | 4.2% |
| Brough | 65,709 | 72.6% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out