Howwood (Renfrewshire)
HOZScotlandManaged by ScotRail
How this station is performing
Howwood (Renfrewshire) had 24,078 scheduled stops to Period 7 of 2026-27, about 66 a day. 89.9% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Howwood (Renfrewshire) opened on 1 December 1876 and closed to passengers on 7 March 1955. It reopened on 12 March 2001, 25 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Lochwinnoch is the oldest (1840) and Milliken Park the newest (1989), with Howwood (Renfrewshire) in between.
The nearest stations to Howwood (Renfrewshire) are Milliken Park (2.4 km north-east), Lochwinnoch (4.2 km south-west), Johnstone (Renfrewshire) (4.6 km north-east), Paisley St James (8.8 km north-east) and Neilston (9.0 km east). 7 stations lie within 10 km in all. Of the five, Neilston is the most punctual at 97.6% and Lochwinnoch the least at 89.4%, with Howwood (Renfrewshire) on 89.9%.
Howwood (Renfrewshire) is named after Howwood, a Village, home to about 1,798 people, but the station stands 0.3 km from its centre.
Compared with 3 stations of a similar size in Scotland, Howwood (Renfrewshire) is the most punctual, at 89.9%. The comparison group includes Lochwinnoch (89.4%), Balloch (84.9%) and Renton (84.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 24,078 | 89.9% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Howwood (Renfrewshire)? Delay Repay
These operators call at Howwood (Renfrewshire) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,880 | 88.0% | 1.3% |
| Period 6 of 2026-27 | 1,877 | 90.7% | 0.7% |
| Period 5 of 2026-27 | 1,880 | 90.2% | 0.5% |
| Period 4 of 2026-27 | 1,880 | 90.8% | 1.3% |
| Period 3 of 2026-27 | 1,880 | 93.5% | 1.0% |
| Period 2 of 2026-27 | 1,880 | 90.0% | 1.4% |
| Period 1 of 2026-27 | 2,173 | 94.4% | 3.4% |
| Period 13 of 2025-26 | 1,581 | 91.6% | 0.9% |
| Period 12 of 2025-26 | 1,880 | 91.8% | 1.2% |
| Period 11 of 2025-26 | 1,880 | 88.2% | 0.5% |
| Period 10 of 2025-26 | 1,628 | 86.6% | 1.5% |
| Period 9 of 2025-26 | 1,813 | 84.0% | 6.5% |
| Period 8 of 2025-26 | 1,846 | 87.0% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lochwinnoch | 24,082 | 89.4% | 1.8% |
| Balloch | 24,041 | 84.9% | 4.3% |
| Renton | 24,041 | 84.2% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out