High Street (Glasgow)
HSTScotlandManaged by ScotRail
How this station is performing
High Street (Glasgow) had 73,869 scheduled stops to Period 7 of 2026-27, about 203 a day. 87.5% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
High Street (Glasgow) opened on 1 February 1871. It was moved to the site it uses now on 15 March 1886. Among the 5 stations nearest to it with a known opening date, Glasgow Queen Street is the oldest (1842) and Argyle Street the newest (1979), with High Street (Glasgow) in between.
The nearest stations to High Street (Glasgow) are Argyle Street (0.7 km west), Glasgow Queen Street (0.8 km north-west), Bellgrove (1.0 km east), Glasgow Central (1.2 km west) and Bridgeton (1.5 km south-east). 78 stations lie within 10 km in all. Of the five, Bellgrove is the most punctual at 87.9% and Argyle Street the least at 84.8%, with High Street (Glasgow) on 87.5%.
Across the whole run of data, the weakest four-week period for High Street (Glasgow) was Period 8 of 2024-25, at 76.6%, some time before the latest year. The strongest was Period 4 of 2023-24, at 94.3%, and the two are 17.7 percentage points apart. Cancellations peaked at 5.4% of scheduled stops in Period 4 of 2025-26, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than High Street (Glasgow) on 87.5%. The comparison group includes Charing Cross (Glasgow) (87.2%), Cambuslang (84.9%) and Newton (Lanark) (88.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 73,869 | 87.5% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at High Street (Glasgow)? Delay Repay
These operators call at High Street (Glasgow) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,628 | 84.7% | 1.7% |
| Period 6 of 2026-27 | 5,628 | 90.2% | 1.3% |
| Period 5 of 2026-27 | 5,628 | 90.0% | 1.5% |
| Period 4 of 2026-27 | 5,628 | 89.7% | 3.0% |
| Period 3 of 2026-27 | 5,630 | 90.3% | 1.1% |
| Period 2 of 2026-27 | 5,628 | 88.3% | 1.1% |
| Period 1 of 2026-27 | 6,493 | 88.5% | 1.3% |
| Period 13 of 2025-26 | 6,169 | 89.0% | 1.1% |
| Period 12 of 2025-26 | 5,628 | 89.3% | 1.6% |
| Period 11 of 2025-26 | 5,628 | 87.4% | 1.6% |
| Period 10 of 2025-26 | 5,020 | 86.2% | 1.5% |
| Period 9 of 2025-26 | 5,628 | 81.9% | 2.9% |
| Period 8 of 2025-26 | 5,533 | 81.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Charing Cross (Glasgow) | 73,867 | 87.2% | 1.5% |
| Cambuslang | 74,200 | 84.9% | 1.6% |
| Newton (Lanark) | 72,038 | 88.7% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out