Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Newton (Lanark)

NTNScotlandManaged by ScotRail

On time, last 13 periods88.7%Great Britain: 83.6%
Cancelled2.0%Great Britain: 3.2%
Stops a day198Scheduled, on average
Punctuality rank661st of 2,374Among ranked stations

How this station is performing

Newton (Lanark) had 72,038 scheduled stops to Period 7 of 2026-27, about 198 a day. 88.7% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.

The nearest stations to Newton (Lanark) are Kirkhill (2.3 km west), Carmyle (2.3 km north-west), Mount Vernon (2.4 km north), Cambuslang (2.5 km west) and Uddingston (3.0 km east). 60 stations lie within 10 km in all. Of the five, Kirkhill is the most punctual at 93.5% and Carmyle the least at 70.9%, with Newton (Lanark) on 88.7%.

Newton (Lanark) is named after Newton, a hamlet, but the station stands 0.9 km from its centre.

Across the whole run of data, the weakest four-week period for Newton (Lanark) was Period 8 of 2024-25, at 82.0%, some time before the latest year. The strongest was Period 1 of 2023-24, at 95.6%, and the two are 13.6 percentage points apart. Cancellations peaked at 6.2% of scheduled stops in Period 5 of 2025-26, against 2.0% over the latest 13 periods.

Compared with 3 stations of a similar size in Scotland, Newton (Lanark) is the most punctual, at 88.7%. The comparison group includes Rutherglen (83.5%), Exhibition Centre (Glasgow) (84.9%) and Bridgeton (86.1%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 95.6%Period 2 of 2023-24: 94.4%Period 3 of 2023-24: 93.1%Period 4 of 2023-24: 93.8%Period 5 of 2023-24: 94.4%Period 6 of 2023-24: 94.9%Period 7 of 2023-24: 90.7%Period 8 of 2023-24: 84.0%Period 9 of 2023-24: 86.4%Period 10 of 2023-24: 89.7%Period 11 of 2023-24: 90.9%Period 12 of 2023-24: 92.2%Period 13 of 2023-24: 93.7%Period 1 of 2024-25: 92.0%Period 2 of 2024-25: 92.5%Period 3 of 2024-25: 93.3%Period 4 of 2024-25: 92.6%Period 5 of 2024-25: 90.0%Period 6 of 2024-25: 92.5%Period 7 of 2024-25: 92.5%Period 8 of 2024-25: 82.0%Period 9 of 2024-25: 86.9%Period 10 of 2024-25: 89.5%Period 11 of 2024-25: 90.3%Period 12 of 2024-25: 92.7%Period 13 of 2024-25: 94.1%Period 1 of 2025-26: 94.3%Period 2 of 2025-26: 92.0%Period 3 of 2025-26: 91.8%Period 4 of 2025-26: 90.8%Period 5 of 2025-26: 90.8%Period 6 of 2025-26: 90.8%Period 7 of 2025-26: 89.2%Period 8 of 2025-26: 84.4%Period 9 of 2025-26: 84.0%Period 10 of 2025-26: 87.3%Period 11 of 2025-26: 90.7%Period 12 of 2025-26: 89.1%Period 13 of 2025-26: 91.0%Period 1 of 2026-27: 90.3%Period 2 of 2026-27: 89.4%Period 3 of 2026-27: 89.4%Period 4 of 2026-27: 90.0%Period 5 of 2026-27: 90.0%Period 6 of 2026-27: 90.6%Period 7 of 2026-27: 86.9%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 1.0%Period 2 of 2023-24: 1.2%Period 3 of 2023-24: 2.4%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.5%Period 6 of 2023-24: 1.1%Period 7 of 2023-24: 5.5%Period 8 of 2023-24: 2.2%Period 9 of 2023-24: 2.4%Period 10 of 2023-24: 2.5%Period 11 of 2023-24: 2.8%Period 12 of 2023-24: 1.2%Period 13 of 2023-24: 0.7%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 1.0%Period 3 of 2024-25: 1.4%Period 4 of 2024-25: 1.6%Period 5 of 2024-25: 2.4%Period 6 of 2024-25: 4.6%Period 7 of 2024-25: 0.9%Period 8 of 2024-25: 2.5%Period 9 of 2024-25: 2.6%Period 10 of 2024-25: 5.1%Period 11 of 2024-25: 2.7%Period 12 of 2024-25: 0.5%Period 13 of 2024-25: 1.4%Period 1 of 2025-26: 1.2%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 1.2%Period 4 of 2025-26: 3.0%Period 5 of 2025-26: 6.2%Period 6 of 2025-26: 1.3%Period 7 of 2025-26: 2.7%Period 8 of 2025-26: 2.0%Period 9 of 2025-26: 3.5%Period 10 of 2025-26: 2.0%Period 11 of 2025-26: 1.3%Period 12 of 2025-26: 2.5%Period 13 of 2025-26: 1.6%Period 1 of 2026-27: 1.8%Period 2 of 2026-27: 1.3%Period 3 of 2026-27: 2.5%Period 4 of 2026-27: 2.5%Period 5 of 2026-27: 1.5%Period 6 of 2026-27: 1.1%Period 7 of 2026-27: 2.4%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail72,03888.7%2.0%

Operators with their own page for this station are linked to it.

Late train at Newton (Lanark)? Delay Repay

These operators call at Newton (Lanark) and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,59286.9%2.4%
Period 6 of 2026-275,59490.6%1.1%
Period 5 of 2026-275,34090.0%1.5%
Period 4 of 2026-275,54890.0%2.5%
Period 3 of 2026-275,50689.4%2.5%
Period 2 of 2026-275,58489.4%1.3%
Period 1 of 2026-276,42390.3%1.8%
Period 13 of 2025-265,03591.0%1.6%
Period 12 of 2025-265,59489.1%2.5%
Period 11 of 2025-265,59390.7%1.3%
Period 10 of 2025-265,03387.3%2.0%
Period 9 of 2025-265,60484.0%3.5%
Period 8 of 2025-265,59284.4%2.0%

Time of year

75%80%85%90%95%P1: 93.0%1P2: 92.0%2P3: 91.9%3P4: 91.8%4P5: 91.4%5P6: 92.2%6P7: 89.7%7P8: 83.5%8P9: 85.8%9P10: 88.8%10P11: 90.6%11P12: 91.3%12P13: 93.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in Scotland

StationScheduled stopsWithin 3 minCancelled
Rutherglen71,33983.5%1.6%
Exhibition Centre (Glasgow)71,12684.9%1.9%
Bridgeton70,34686.1%1.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out