Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Hastings

HGSSouth EastManaged by Southeastern

On time, last 13 periods77.5%Great Britain: 83.6%
Cancelled4.4%Great Britain: 3.2%
Stops a day173Scheduled, on average
Punctuality rank1676th of 2,374Among ranked stations

How this station is performing

Hastings had 62,840 scheduled stops to Period 7 of 2026-27, about 173 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.

Hastings opened on 13 February 1851, 175 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hastings is the oldest; the next oldest, St Leonards Warrior Square, dates from 1851.

The nearest stations to Hastings are St Leonards Warrior Square (1.2 km west), Ore (1.4 km north-east), West St Leonards (2.6 km west), Three Oaks (5.4 km north-east) and Crowhurst (6.3 km north-west). 9 stations lie within 10 km in all. Of the five, Ore is the most punctual at 80.9% and West St Leonards the least at 76.9%, with Hastings on 77.5%.

Hastings takes its name from a market town called Hastings, home to about 91,053 people, and the station stands 0.6 km from its centre.

2 operators call at Hastings: GTR (79.3%, 60% of stops) and Southeastern (74.9%, 40% of stops). They are close together, with GTR leading on 79.3% and Southeastern trailing on 74.9%, a gap of 4.4 percentage points.

1 of 3 stations of a similar size in South East are more punctual than Hastings on 77.5%. The comparison group includes Brockenhurst (76.6%), Hampden Park (Sussex) (80.0%) and Bletchley (75.0%).

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 88.7%Period 2 of 2023-24: 86.0%Period 3 of 2023-24: 82.5%Period 4 of 2023-24: 85.6%Period 5 of 2023-24: 83.6%Period 6 of 2023-24: 84.1%Period 7 of 2023-24: 82.5%Period 8 of 2023-24: 78.7%Period 9 of 2023-24: 71.0%Period 10 of 2023-24: 82.1%Period 11 of 2023-24: 82.0%Period 12 of 2023-24: 82.9%Period 13 of 2023-24: 85.8%Period 1 of 2024-25: 86.8%Period 2 of 2024-25: 86.6%Period 3 of 2024-25: 87.4%Period 4 of 2024-25: 85.7%Period 5 of 2024-25: 83.3%Period 6 of 2024-25: 83.9%Period 7 of 2024-25: 83.7%Period 8 of 2024-25: 79.8%Period 9 of 2024-25: 73.5%Period 10 of 2024-25: 79.8%Period 11 of 2024-25: 80.1%Period 12 of 2024-25: 82.0%Period 13 of 2024-25: 88.6%Period 1 of 2025-26: 89.9%Period 2 of 2025-26: 84.5%Period 3 of 2025-26: 85.3%Period 4 of 2025-26: 80.4%Period 5 of 2025-26: 81.4%Period 6 of 2025-26: 77.6%Period 7 of 2025-26: 81.3%Period 8 of 2025-26: 79.7%Period 9 of 2025-26: 76.3%Period 10 of 2025-26: 80.6%Period 11 of 2025-26: 84.2%Period 12 of 2025-26: 84.8%Period 13 of 2025-26: 85.3%Period 1 of 2026-27: 84.6%Period 2 of 2026-27: 80.2%Period 3 of 2026-27: 81.7%Period 4 of 2026-27: 81.2%Period 5 of 2026-27: 71.8%Period 6 of 2026-27: 51.1%Period 7 of 2026-27: 63.0%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 1.5%Period 2 of 2023-24: 2.5%Period 3 of 2023-24: 2.6%Period 4 of 2023-24: 2.5%Period 5 of 2023-24: 3.7%Period 6 of 2023-24: 2.0%Period 7 of 2023-24: 1.7%Period 8 of 2023-24: 7.9%Period 9 of 2023-24: 3.0%Period 10 of 2023-24: 5.0%Period 11 of 2023-24: 1.7%Period 12 of 2023-24: 3.2%Period 13 of 2023-24: 1.8%Period 1 of 2024-25: 2.7%Period 2 of 2024-25: 2.6%Period 3 of 2024-25: 2.5%Period 4 of 2024-25: 3.4%Period 5 of 2024-25: 2.7%Period 6 of 2024-25: 3.6%Period 7 of 2024-25: 3.5%Period 8 of 2024-25: 2.3%Period 9 of 2024-25: 3.6%Period 10 of 2024-25: 3.1%Period 11 of 2024-25: 5.4%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 1.7%Period 1 of 2025-26: 1.2%Period 2 of 2025-26: 4.0%Period 3 of 2025-26: 2.0%Period 4 of 2025-26: 3.8%Period 5 of 2025-26: 3.1%Period 6 of 2025-26: 4.2%Period 7 of 2025-26: 5.8%Period 8 of 2025-26: 3.4%Period 9 of 2025-26: 3.5%Period 10 of 2025-26: 3.5%Period 11 of 2025-26: 2.8%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 3.0%Period 1 of 2026-27: 3.7%Period 2 of 2026-27: 6.0%Period 3 of 2026-27: 5.7%Period 4 of 2026-27: 3.0%Period 5 of 2026-27: 5.0%Period 6 of 2026-27: 9.0%Period 7 of 2026-27: 6.9%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
GTR37,54779.3%6.3%
Southeastern25,29374.9%1.6%

Operators with their own page for this station are linked to it.

Late train at Hastings? Delay Repay

These operators call at Hastings and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,06263.0%6.9%
Period 6 of 2026-274,91651.1%9.0%
Period 5 of 2026-274,53171.8%5.0%
Period 4 of 2026-275,05181.2%3.0%
Period 3 of 2026-275,00681.7%5.7%
Period 2 of 2026-274,87980.2%6.0%
Period 1 of 2026-275,53584.6%3.7%
Period 13 of 2025-265,11585.3%3.0%
Period 12 of 2025-264,79284.8%1.8%
Period 11 of 2025-265,08884.2%2.8%
Period 10 of 2025-264,51880.6%3.5%
Period 9 of 2025-264,98276.3%3.5%
Period 8 of 2025-263,36579.7%3.4%

Time of year

70%75%80%85%90%P1: 87.4%1P2: 84.3%2P3: 84.3%3P4: 83.1%4P5: 80.2%5P6: 74.3%6P7: 77.6%7P8: 79.4%8P9: 73.7%9P10: 80.8%10P11: 82.2%11P12: 83.2%12P13: 86.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Brockenhurst63,32576.6%4.5%
Hampden Park (Sussex)64,28180.0%3.6%
Bletchley60,92775.0%5.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out