Southeastern at Hastings
How this operator is doing here
Southeastern had 25,293 scheduled stops at Hastings in the 13 periods to Period 7 of 2026-27, 40% of the station's total. 74.9% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Hastings also serve St Leonards Warrior Square (1.2 km west, – on time, 1.8% cancelled), Ore (1.4 km north-east, – on time, – cancelled), West St Leonards (2.6 km west, 76.9% on time, 1.9% cancelled), Crowhurst (6.3 km north-west, – on time, 1.8% cancelled), Battle (8.4 km north-west, 76.0% on time, 1.9% cancelled) and Robertsbridge (16.1 km north-west, 77.3% on time, 1.8% cancelled), which are the stations on its network closest to Hastings.
Within 30 km of here, Southeastern runs best at Robertsbridge, 16.1 km north-west (77.3%), and worst at Stonegate, 23.4 km north-west (70.9%).
The busiest Southeastern station within 30 km of Hastings is Battle, 8.4 km north-west, with about 70 scheduled stops a day.
Of the 2 operators with enough records at Hastings, Southeastern is the least punctual, at 74.9%.
Southeastern at Hastings has slipped a little, from 78.6% within three minutes in the previous 13 periods to 74.9% in the latest 13, a fall of 3.7 percentage points. Cancellations held steady at 1.6% of scheduled stops, against 1.2% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,014 | 58.1% | 1.8% |
| Period 6 of 2026-27 | 2,002 | 52.5% | 1.8% |
| Period 5 of 2026-27 | 2,019 | 71.6% | 1.6% |
| Period 4 of 2026-27 | 2,002 | 78.9% | 0.4% |
| Period 3 of 2026-27 | 2,015 | 79.7% | 2.0% |
| Period 2 of 2026-27 | 1,956 | 78.8% | 2.3% |
| Period 1 of 2026-27 | 2,296 | 82.8% | 0.4% |
| Period 13 of 2025-26 | 2,011 | 81.8% | 0.6% |
| Period 12 of 2025-26 | 1,935 | 83.3% | 0.9% |
| Period 11 of 2025-26 | 2,016 | 81.0% | 2.3% |
| Period 10 of 2025-26 | 1,839 | 77.3% | 2.4% |
| Period 9 of 2025-26 | 2,011 | 72.3% | 2.4% |
| Period 8 of 2025-26 | 1,177 | 75.4% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Hastings
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 37,547 | 79.3% | 6.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out