Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Hastings

All trains at HastingsGTR across BritainSouth East

On time, last 13 periods79.3%Whole station: 77.5%
Cancelled6.3%Whole station: 4.4%
Scheduled stops37,547Of 62,840 at the station

How this operator is doing here

GTR had 37,547 scheduled stops at Hastings in the 13 periods to Period 7 of 2026-27, 60% of the station's total. 79.3% of recorded arrivals came within three minutes and 6.3% of stops were cancelled.

GTR trains at Hastings also serve St Leonards Warrior Square (1.2 km west, – on time, 5.0% cancelled), Ore (1.4 km north-east, 80.8% on time, 9.2% cancelled), Three Oaks (5.4 km north-east, 79.0% on time, 3.8% cancelled), Doleham (7.1 km north, – on time, 3.5% cancelled), Bexhill (7.4 km west, 82.7% on time, 4.5% cancelled) and Collington (8.7 km west, 83.0% on time, 4.9% cancelled), which are the stations on its network closest to Hastings.

Within 30 km of here, GTR runs best at Winchelsea, 12.2 km north-east (88.5%), and worst at Pevensey and Westham, 18.3 km west (76.6%).

The busiest GTR station within 30 km of Hastings is Hampden Park (Sussex), 22.0 km west, with about 177 scheduled stops a day.

GTR at Hastings has slipped a little, from 84.2% within three minutes in the previous 13 periods to 79.3% in the latest 13, a fall of 4.9 percentage points. Cancellations rose to 6.3% of scheduled stops from 4.7%, which is 1.6 percentage points more.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 91.0%Period 2 of 2023-24: 87.9%Period 3 of 2023-24: 84.7%Period 4 of 2023-24: 86.0%Period 5 of 2023-24: 82.0%Period 6 of 2023-24: 84.5%Period 7 of 2023-24: 83.4%Period 8 of 2023-24: 79.2%Period 9 of 2023-24: 70.5%Period 10 of 2023-24: 85.9%Period 11 of 2023-24: 86.1%Period 12 of 2023-24: 82.5%Period 13 of 2023-24: 87.9%Period 1 of 2024-25: 87.9%Period 2 of 2024-25: 86.5%Period 3 of 2024-25: 87.6%Period 4 of 2024-25: 85.8%Period 5 of 2024-25: 82.2%Period 6 of 2024-25: 84.5%Period 7 of 2024-25: 87.1%Period 8 of 2024-25: 84.8%Period 9 of 2024-25: 78.5%Period 10 of 2024-25: 84.4%Period 11 of 2024-25: 84.5%Period 12 of 2024-25: 85.4%Period 13 of 2024-25: 90.7%Period 1 of 2025-26: 91.8%Period 2 of 2025-26: 86.7%Period 3 of 2025-26: 85.8%Period 4 of 2025-26: 81.3%Period 5 of 2025-26: 80.6%Period 6 of 2025-26: 76.8%Period 7 of 2025-26: 83.8%Period 8 of 2025-26: 82.1%Period 9 of 2025-26: 79.0%Period 10 of 2025-26: 82.9%Period 11 of 2025-26: 86.3%Period 12 of 2025-26: 85.8%Period 13 of 2025-26: 87.6%Period 1 of 2026-27: 86.0%Period 2 of 2026-27: 81.2%Period 3 of 2026-27: 83.2%Period 4 of 2026-27: 82.7%Period 5 of 2026-27: 71.9%Period 6 of 2026-27: 50.0%Period 7 of 2026-27: 66.5%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.0%Period 2 of 2023-24: 3.4%Period 3 of 2023-24: 3.5%Period 4 of 2023-24: 4.0%Period 5 of 2023-24: 5.4%Period 6 of 2023-24: 2.8%Period 7 of 2023-24: 2.7%Period 8 of 2023-24: 10.3%Period 9 of 2023-24: 4.5%Period 10 of 2023-24: 3.8%Period 11 of 2023-24: 2.6%Period 12 of 2023-24: 4.7%Period 13 of 2023-24: 2.9%Period 1 of 2024-25: 4.4%Period 2 of 2024-25: 3.4%Period 3 of 2024-25: 3.2%Period 4 of 2024-25: 5.1%Period 5 of 2024-25: 3.9%Period 6 of 2024-25: 4.5%Period 7 of 2024-25: 3.3%Period 8 of 2024-25: 3.3%Period 9 of 2024-25: 5.0%Period 10 of 2024-25: 4.2%Period 11 of 2024-25: 7.3%Period 12 of 2024-25: 3.7%Period 13 of 2024-25: 2.6%Period 1 of 2025-26: 1.6%Period 2 of 2025-26: 4.5%Period 3 of 2025-26: 3.3%Period 4 of 2025-26: 5.7%Period 5 of 2025-26: 5.1%Period 6 of 2025-26: 6.5%Period 7 of 2025-26: 8.0%Period 8 of 2025-26: 4.3%Period 9 of 2025-26: 4.2%Period 10 of 2025-26: 4.3%Period 11 of 2025-26: 3.0%Period 12 of 2025-26: 2.5%Period 13 of 2025-26: 4.5%Period 1 of 2026-27: 6.0%Period 2 of 2026-27: 8.4%Period 3 of 2026-27: 8.2%Period 4 of 2026-27: 4.7%Period 5 of 2026-27: 7.8%Period 6 of 2026-27: 13.9%Period 7 of 2026-27: 10.3%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-273,04866.5%10.3%
Period 6 of 2026-272,91450.0%13.9%
Period 5 of 2026-272,51271.9%7.8%
Period 4 of 2026-273,04982.7%4.7%
Period 3 of 2026-272,99183.2%8.2%
Period 2 of 2026-272,92381.2%8.4%
Period 1 of 2026-273,23986.0%6.0%
Period 13 of 2025-263,10487.6%4.5%
Period 12 of 2025-262,85785.8%2.5%
Period 11 of 2025-263,07286.3%3.0%
Period 10 of 2025-262,67982.9%4.3%
Period 9 of 2025-262,97179.0%4.2%
Period 8 of 2025-262,18882.1%4.3%

Time of year

70%80%90%P1: 89.2%1P2: 85.5%2P3: 85.4%3P4: 83.8%4P5: 79.4%5P6: 74.4%6P7: 80.2%7P8: 82.0%8P9: 76.4%9P10: 84.4%10P11: 85.7%11P12: 84.6%12P13: 88.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Hastings

OperatorScheduled stopsWithin 3 minCancelled
Southeastern25,29374.9%1.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out