Hampden Park (Sussex)
HMDSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Hampden Park (Sussex) had 64,281 scheduled stops to Period 7 of 2026-27, about 177 a day. 80.0% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Hampden Park (Sussex) opened on 2 January 1888, 138 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Polegate is the oldest (1846) and Normans Bay the newest (1905), with Hampden Park (Sussex) in between.
The nearest stations to Hampden Park (Sussex) are Eastbourne (2.9 km south), Polegate (3.6 km north-west), Pevensey and Westham (3.9 km north-east), Pevensey Bay (5.1 km north-east) and Normans Bay (8.4 km north-east). 6 stations lie within 10 km in all. At 80.0%, Hampden Park (Sussex) is more punctual than every one of them; the best of the five, Normans Bay, manages 79.4%.
Hampden Park (Sussex) is named after Hampden Park, a suburb, home to about 10,591 people, but the station stands 0.2 km from its centre.
Compared with 3 stations of a similar size in South East, Hampden Park (Sussex) is the most punctual, at 80.0%. The comparison group includes Fareham (72.5%), Brockenhurst (76.6%) and Hastings (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 64,281 | 80.0% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Hampden Park (Sussex)? Delay Repay
These operators call at Hampden Park (Sussex) and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,028 | 64.4% | 5.8% |
| Period 6 of 2026-27 | 4,622 | 43.0% | 4.3% |
| Period 5 of 2026-27 | 4,056 | 74.2% | 6.8% |
| Period 4 of 2026-27 | 5,084 | 83.7% | 2.8% |
| Period 3 of 2026-27 | 4,967 | 82.3% | 5.0% |
| Period 2 of 2026-27 | 5,069 | 84.2% | 5.1% |
| Period 1 of 2026-27 | 5,477 | 88.4% | 3.7% |
| Period 13 of 2025-26 | 5,602 | 89.7% | 2.4% |
| Period 12 of 2025-26 | 4,991 | 87.2% | 1.3% |
| Period 11 of 2025-26 | 5,017 | 85.8% | 1.8% |
| Period 10 of 2025-26 | 4,465 | 85.3% | 2.3% |
| Period 9 of 2025-26 | 4,957 | 82.1% | 2.2% |
| Period 8 of 2025-26 | 4,946 | 82.8% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fareham | 65,090 | 72.5% | 4.0% |
| Brockenhurst | 63,325 | 76.6% | 4.5% |
| Hastings | 62,840 | 77.5% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out