Brockenhurst
BCUSouth EastManaged by South Western Railway
How this station is performing
Brockenhurst had 63,325 scheduled stops to Period 7 of 2026-27, about 174 a day. 76.6% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Brockenhurst opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Brockenhurst is the oldest; the next oldest, Beaulieu Road, dates from 1847.
The nearest stations to Brockenhurst are Sway (4.4 km south-west), Beaulieu Road (6.5 km north-east), Lymington Town (6.7 km south-east), Lymington Pier (7.2 km south-east) and Ashurst New Forest (8.8 km north). 6 stations lie within 10 km in all. Of the five, Lymington Town is the most punctual at 97.4% and Beaulieu Road the least at 71.2%, with Brockenhurst on 76.6%.
Brockenhurst takes its name from a Village called Brockenhurst, home to about 3,552 people, and the station stands 0.6 km from its centre.
2 operators call at Brockenhurst: South Western Railway (77.8%, 92% of stops) and CrossCountry (62.3%, 8% of stops). The operator you travel with matters: South Western Railway reaches 77.8% within three minutes while CrossCountry manages 62.3%, a gap of 15.5 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Brockenhurst on 76.6%. The comparison group includes Hastings (77.5%), Hampden Park (Sussex) (80.0%) and Fareham (72.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 58,020 | 77.8% | 4.1% |
| CrossCountry | 5,305 | 62.3% | 9.3% |
Operators with their own page for this station are linked to it.
Late train at Brockenhurst? Delay Repay
These operators call at Brockenhurst and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,031 | 71.4% | 4.0% |
| Period 6 of 2026-27 | 5,372 | 79.0% | 3.0% |
| Period 5 of 2026-27 | 5,359 | 74.0% | 4.1% |
| Period 4 of 2026-27 | 5,314 | 65.6% | 5.7% |
| Period 3 of 2026-27 | 5,210 | 75.9% | 6.5% |
| Period 2 of 2026-27 | 5,024 | 74.6% | 5.8% |
| Period 1 of 2026-27 | 5,236 | 87.0% | 2.0% |
| Period 13 of 2025-26 | 5,147 | 84.7% | 4.0% |
| Period 12 of 2025-26 | 4,264 | 84.0% | 3.9% |
| Period 11 of 2025-26 | 4,018 | 77.7% | 5.7% |
| Period 10 of 2025-26 | 4,107 | 78.1% | 5.4% |
| Period 9 of 2025-26 | 4,695 | 71.4% | 3.6% |
| Period 8 of 2025-26 | 4,548 | 72.9% | 5.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Hastings | 62,840 | 77.5% | 4.4% |
| Hampden Park (Sussex) | 64,281 | 80.0% | 3.6% |
| Fareham | 65,090 | 72.5% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out