Horsforth
HRSYorkshire and The HumberManaged by Northern Trains
How this station is performing
Horsforth had 32,010 scheduled stops to Period 7 of 2026-27, about 88 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Horsforth opened on 10 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Apperley Bridge is the oldest (1846) and Burley Park the newest (1988), with Horsforth in between.
The nearest stations to Horsforth are Kirkstall Forge (2.5 km south), Headingley (4.1 km south-east), Bramley (West Yorkshire) (4.7 km south), Apperley Bridge (5.1 km west) and Burley Park (5.3 km south-east). 15 stations lie within 10 km in all. Of the five, Apperley Bridge is the most punctual at 89.7% and Bramley (West Yorkshire) the least at 71.3%, with Horsforth on 77.2%.
Horsforth takes its name from a town called Horsforth, home to about 21,555 people, and the station stands 1.7 km from its centre.
2 operators call at Horsforth: Northern (77.8%, 87% of stops) and LNER (73.1%, 13% of stops). They are close together, with Northern leading on 77.8% and LNER trailing on 73.1%, a gap of 4.7 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Horsforth is the most punctual, at 77.2%. The comparison group includes Mirfield (73.3%), Harrogate (75.9%) and Northallerton (65.6%).
Period by period
Operators calling here
Operators with their own page for this station are linked to it.
Late train at Horsforth? Delay Repay
These operators call at Horsforth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,438 | 75.2% | 2.7% |
| Period 6 of 2026-27 | 2,486 | 85.9% | 3.8% |
| Period 5 of 2026-27 | 2,521 | 81.6% | 3.7% |
| Period 4 of 2026-27 | 2,489 | 79.1% | 4.1% |
| Period 3 of 2026-27 | 2,462 | 74.4% | 6.1% |
| Period 2 of 2026-27 | 2,468 | 81.7% | 4.1% |
| Period 1 of 2026-27 | 2,863 | 85.0% | 3.8% |
| Period 13 of 2025-26 | 2,490 | 85.5% | 0.9% |
| Period 12 of 2025-26 | 2,418 | 84.1% | 2.0% |
| Period 11 of 2025-26 | 2,435 | 81.0% | 2.6% |
| Period 10 of 2025-26 | 2,206 | 72.1% | 2.7% |
| Period 9 of 2025-26 | 2,370 | 49.3% | 6.4% |
| Period 8 of 2025-26 | 2,364 | 64.6% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mirfield | 31,735 | 73.3% | 2.3% |
| Harrogate | 31,553 | 75.9% | 3.1% |
| Northallerton | 30,869 | 65.6% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out