Northern at Harrogate
All trains at HarrogateNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 27,434 scheduled stops at Harrogate in the 13 periods to Period 7 of 2026-27, 87% of the station's total. 74.2% of recorded arrivals came within three minutes and 2.6% of stops were cancelled.
Northern trains at Harrogate also serve Hornbeam Park (1.6 km south-east, 76.4% on time, 3.0% cancelled), Starbeck (2.5 km east, 75.8% on time, 2.7% cancelled), Pannal (3.9 km south, 75.9% on time, 3.0% cancelled), Knaresborough (4.7 km east, 73.3% on time, 2.7% cancelled), Weeton (8.3 km south, 78.0% on time, 3.0% cancelled) and Cattal (14.2 km east, 76.1% on time, 2.7% cancelled), which are the stations on its network closest to Harrogate.
Within 30 km of here, Northern runs best at Bradford Forster Square, 26.0 km south-west (93.3%), and worst at Micklefield, 26.6 km south-east (66.0%).
The busiest Northern station within 30 km of Harrogate is Leeds, 22.1 km south, with about 780 scheduled stops a day.
Of the 2 operators with enough records at Harrogate, Northern is the least punctual, at 74.2%.
Northern at Harrogate improved sharply over the past year. In the latest 13 periods 74.2% of stops came within three minutes of the timetable, up 12.4 percentage points from 61.8% in the 13 before. Cancellations held steady at 2.6% of scheduled stops, against 2.9% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,095 | 75.0% | 2.0% |
| Period 6 of 2026-27 | 2,096 | 86.0% | 2.7% |
| Period 5 of 2026-27 | 2,096 | 82.9% | 2.4% |
| Period 4 of 2026-27 | 2,090 | 79.4% | 3.1% |
| Period 3 of 2026-27 | 2,100 | 80.5% | 6.2% |
| Period 2 of 2026-27 | 2,091 | 81.2% | 3.3% |
| Period 1 of 2026-27 | 2,406 | 86.3% | 2.6% |
| Period 13 of 2025-26 | 2,247 | 80.1% | 0.7% |
| Period 12 of 2025-26 | 2,096 | 75.8% | 1.6% |
| Period 11 of 2025-26 | 2,096 | 75.1% | 2.1% |
| Period 10 of 2025-26 | 1,906 | 63.3% | 1.9% |
| Period 9 of 2025-26 | 2,071 | 41.4% | 4.8% |
| Period 8 of 2025-26 | 2,044 | 52.9% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Harrogate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 4,119 | 87.5% | 6.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out