Northern had 64,695 scheduled stops at Halifax in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 72.0% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Northern trains at Halifax also serve Sowerby Bridge (3.8 km west, 58.5% on time, 2.6% cancelled), Brighouse (5.5 km south-east, 83.5% on time, 2.2% cancelled), Low Moor (7.4 km north-east, 71.7% on time, 2.8% cancelled), Mytholmroyd (8.5 km west, 59.3% on time, 2.6% cancelled), Huddersfield (9.2 km south-east, 82.0% on time, 1.5% cancelled) and Lockwood (10.2 km south, 85.6% on time, 1.6% cancelled), which are the stations on its network closest to Halifax.
Within 30 km of here, Northern runs best at Bradford Forster Square, 10.8 km north-east (93.3%), and worst at Sowerby Bridge, 3.8 km west (58.5%).
The busiest Northern station within 30 km of Halifax is Leeds, 21.7 km east, with about 780 scheduled stops a day.
Of the 2 operators with enough records at Halifax, Northern is the most punctual, at 72.0%.
For Northern, Halifax is the 409th best of 493 ranked stations. Its 72.0% here is 6.6 percentage points below the 78.6% across the whole network.
Northern at Halifax has edged up: 72.0% of stops came within three minutes of the timetable in the latest 13 periods, 2.3 percentage points better than the 69.7% of the 13 before. Cancellations fell to 3.7% of scheduled stops from 5.2%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,199 | 70.3% | 2.2% |
| Period 6 of 2026-27 | 4,765 | 74.2% | 3.5% |
| Period 5 of 2026-27 | 4,810 | 73.7% | 3.5% |
| Period 4 of 2026-27 | 4,861 | 75.1% | 3.9% |
| Period 3 of 2026-27 | 4,800 | 69.1% | 3.1% |
| Period 2 of 2026-27 | 5,381 | 70.5% | 3.0% |
| Period 1 of 2026-27 | 5,674 | 80.0% | 3.5% |
| Period 13 of 2025-26 | 5,358 | 78.4% | 3.1% |
| Period 12 of 2025-26 | 4,880 | 73.5% | 3.7% |
| Period 11 of 2025-26 | 4,881 | 74.4% | 4.2% |
| Period 10 of 2025-26 | 4,458 | 73.1% | 5.0% |
| Period 9 of 2025-26 | 4,734 | 58.5% | 5.9% |
| Period 8 of 2025-26 | 4,894 | 62.9% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Halifax
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grand Central | 2,708 | 64.9% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out