Haddenham and Thame Parkway
HDMSouth EastManaged by Chiltern Railways
How this station is performing
Haddenham and Thame Parkway had 32,175 scheduled stops to Period 7 of 2026-27, about 88 a day. 85.2% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Haddenham and Thame Parkway opened on 2 April 1906 and closed to passengers on 7 January 1963. It reopened on 5 October 1987, 39 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Princes Risborough is the oldest (1862) and Aylesbury Vale Parkway the newest (2008), with Haddenham and Thame Parkway in between.
The nearest stations to Haddenham and Thame Parkway are Monks Risborough (8.7 km south-east), Aylesbury Vale Parkway (8.8 km north-east), Princes Risborough (9.0 km south-east), Little Kimble (9.4 km east) and Aylesbury (10.0 km north-east). 5 stations lie within 10 km in all. At 85.2%, Haddenham and Thame Parkway is less punctual than all of them; the best of the five, Little Kimble, manages 94.5%.
Haddenham and Thame Parkway is a parkway station, 3.0 km from the centre of Thame, a market town, home to about 13,269 people, which gives it its name.
Compared with 3 stations of a similar size in South East, Haddenham and Thame Parkway is the most punctual, at 85.2%. The comparison group includes Thanet Parkway (77.5%), Maidstone East (82.6%) and Petersfield (75.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 32,175 | 85.2% | 1.0% |
Operators with their own page for this station are linked to it.
Late train at Haddenham and Thame Parkway? Delay Repay
These operators call at Haddenham and Thame Parkway and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,479 | 83.8% | 0.6% |
| Period 6 of 2026-27 | 2,279 | 81.0% | 0.7% |
| Period 5 of 2026-27 | 2,460 | 79.0% | 1.4% |
| Period 4 of 2026-27 | 2,486 | 79.4% | 1.4% |
| Period 3 of 2026-27 | 2,396 | 82.9% | 0.7% |
| Period 2 of 2026-27 | 2,465 | 85.1% | 0.7% |
| Period 1 of 2026-27 | 2,835 | 90.4% | 0.8% |
| Period 13 of 2025-26 | 2,615 | 89.6% | 1.1% |
| Period 12 of 2025-26 | 2,455 | 89.9% | 0.0% |
| Period 11 of 2025-26 | 2,440 | 88.3% | 0.7% |
| Period 10 of 2025-26 | 2,341 | 85.9% | 1.0% |
| Period 9 of 2025-26 | 2,414 | 84.7% | 2.8% |
| Period 8 of 2025-26 | 2,510 | 85.6% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Thanet Parkway | 31,781 | 77.5% | 0.7% |
| Maidstone East | 31,555 | 82.6% | 1.3% |
| Petersfield | 32,919 | 75.1% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out