Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Thanet Parkway

THPSouth EastManaged by Southeastern

On time, last 13 periods77.5%Great Britain: 83.6%
Cancelled0.7%Great Britain: 3.2%
Stops a day87Scheduled, on average
Punctuality rank1687th of 2,374Among ranked stations

How this station is performing

Thanet Parkway had 31,781 scheduled stops to Period 7 of 2026-27, about 87 a day. 77.5% of recorded arrivals were within three minutes of the timetable and 0.7% of scheduled stops were cancelled.

Thanet Parkway opened on 31 July 2023, 3 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Thanet Parkway is the newest; the oldest, Minster, opened in 1846.

The nearest stations to Thanet Parkway are Minster (3.1 km west), Ramsgate (3.2 km east), Dumpton Park (4.7 km east), Westgate-on-Sea (5.8 km north) and Broadstairs (6.0 km north-east). 8 stations lie within 10 km in all. At 77.5%, Thanet Parkway is less punctual than all of them; the best of the five, Minster, manages 82.4%.

For Thanet Parkway, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 66.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2026-27, at 86.6%, which is 20.4 percentage points higher.

Compared with 3 stations of a similar size in South East, Thanet Parkway is the least punctual, at 77.5%. All of them are ahead, including Maidstone East (82.6%), Borough Green and Wrotham (81.2%) and Haddenham and Thame Parkway (85.2%).

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 5 of 2023-24: 80.9%Period 6 of 2023-24: 82.3%Period 7 of 2023-24: 83.5%Period 8 of 2023-24: 74.8%Period 9 of 2023-24: 77.9%Period 10 of 2023-24: 75.8%Period 11 of 2023-24: 82.7%Period 12 of 2023-24: 78.9%Period 13 of 2023-24: 84.9%Period 1 of 2024-25: 83.8%Period 2 of 2024-25: 80.6%Period 3 of 2024-25: 81.0%Period 4 of 2024-25: 81.4%Period 5 of 2024-25: 83.0%Period 6 of 2024-25: 82.4%Period 7 of 2024-25: 79.8%Period 8 of 2024-25: 77.9%Period 9 of 2024-25: 69.0%Period 10 of 2024-25: 77.8%Period 11 of 2024-25: 79.0%Period 12 of 2024-25: 82.6%Period 13 of 2024-25: 82.3%Period 1 of 2025-26: 82.7%Period 2 of 2025-26: 81.2%Period 3 of 2025-26: 82.9%Period 4 of 2025-26: 79.0%Period 5 of 2025-26: 79.7%Period 6 of 2025-26: 79.1%Period 7 of 2025-26: 77.1%Period 8 of 2025-26: 74.5%Period 9 of 2025-26: 66.2%Period 10 of 2025-26: 72.9%Period 11 of 2025-26: 82.3%Period 12 of 2025-26: 83.9%Period 13 of 2025-26: 85.8%Period 1 of 2026-27: 86.6%Period 2 of 2026-27: 78.4%Period 3 of 2026-27: 77.1%Period 4 of 2026-27: 81.9%Period 5 of 2026-27: 77.3%Period 6 of 2026-27: 70.3%Period 7 of 2026-27: 67.9%
This pageGreat Britain
0%2%4%Period 5 of 2023-24: 0.9%Period 6 of 2023-24: 0.2%Period 7 of 2023-24: 0.9%Period 8 of 2023-24: 1.3%Period 9 of 2023-24: 0.8%Period 10 of 2023-24: 1.3%Period 11 of 2023-24: 1.0%Period 12 of 2023-24: 3.0%Period 13 of 2023-24: 0.4%Period 1 of 2024-25: 0.3%Period 2 of 2024-25: 1.1%Period 3 of 2024-25: 0.7%Period 4 of 2024-25: 0.9%Period 5 of 2024-25: 0.6%Period 6 of 2024-25: 0.6%Period 7 of 2024-25: 0.7%Period 8 of 2024-25: 0.7%Period 9 of 2024-25: 1.9%Period 10 of 2024-25: 2.6%Period 11 of 2024-25: 0.6%Period 12 of 2024-25: 0.7%Period 13 of 2024-25: 0.5%Period 1 of 2025-26: 0.5%Period 2 of 2025-26: 1.4%Period 3 of 2025-26: 0.7%Period 4 of 2025-26: 1.3%Period 5 of 2025-26: 0.5%Period 6 of 2025-26: 0.8%Period 7 of 2025-26: 1.3%Period 8 of 2025-26: 0.8%Period 9 of 2025-26: 0.5%Period 10 of 2025-26: 0.7%Period 11 of 2025-26: 0.5%Period 12 of 2025-26: 0.4%Period 13 of 2025-26: 0.7%Period 1 of 2026-27: 0.4%Period 2 of 2026-27: 1.0%Period 3 of 2026-27: 1.2%Period 4 of 2026-27: 1.1%Period 5 of 2026-27: 0.4%Period 6 of 2026-27: 0.8%Period 7 of 2026-27: 0.6%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Southeastern31,78177.5%0.7%

Operators with their own page for this station are linked to it.

Late train at Thanet Parkway? Delay Repay

These operators call at Thanet Parkway and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,48567.9%0.6%
Period 6 of 2026-272,35870.3%0.8%
Period 5 of 2026-272,45377.3%0.4%
Period 4 of 2026-272,44881.9%1.1%
Period 3 of 2026-272,32477.1%1.2%
Period 2 of 2026-272,41078.4%1.0%
Period 1 of 2026-272,83686.6%0.4%
Period 13 of 2025-262,60885.8%0.7%
Period 12 of 2025-262,45683.9%0.4%
Period 11 of 2025-262,45282.3%0.5%
Period 10 of 2025-262,01272.9%0.7%
Period 9 of 2025-262,45466.2%0.5%
Period 8 of 2025-262,48574.5%0.8%

Time of year

70%80%90%P1: 84.8%1P2: 79.9%2P3: 80.3%3P4: 80.7%4P5: 80.0%5P6: 77.8%6P7: 76.0%7P8: 75.8%8P9: 69.7%9P10: 75.3%10P11: 81.2%11P12: 82.4%12P13: 84.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in South East

StationScheduled stopsWithin 3 minCancelled
Maidstone East31,55582.6%1.3%
Borough Green and Wrotham31,40981.2%1.4%
Haddenham and Thame Parkway32,17585.2%1.0%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out