Petersfield
PTRSouth EastManaged by South Western Railway
How this station is performing
Petersfield had 32,919 scheduled stops to Period 7 of 2026-27, about 90 a day. 75.1% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Petersfield opened on 1 January 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Alton is the oldest (1852) and Warblington the newest (1907), with Petersfield in between.
The nearest stations to Petersfield are Liss (5.4 km north-east), Liphook (12.2 km north-east), Rowlands Castle (12.7 km south), Alton (16.3 km north) and Warblington (17.1 km south). 1 stations lie within 10 km in all. At 75.1%, Petersfield is less punctual than all of them; the best of the five, Alton, manages 85.0%.
Petersfield takes its name from a market town called Petersfield, home to about 14,974 people, and the station stands 0.6 km from its centre.
For Petersfield, the weakest four-week period in the data is a recent one: Period 10 of 2025-26, when only 66.7% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2023-24, at 92.2%, which is 25.5 percentage points higher.
Compared with 3 stations of a similar size in South East, Petersfield is the least punctual, at 75.1%. All of them are ahead, including Fleet (79.6%), Haddenham and Thame Parkway (85.2%) and Ore (80.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 32,919 | 75.1% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Petersfield? Delay Repay
These operators call at Petersfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,633 | 67.3% | 3.9% |
| Period 6 of 2026-27 | 2,669 | 69.1% | 2.1% |
| Period 5 of 2026-27 | 2,621 | 75.4% | 3.1% |
| Period 4 of 2026-27 | 2,585 | 78.0% | 3.5% |
| Period 3 of 2026-27 | 2,576 | 83.2% | 3.1% |
| Period 2 of 2026-27 | 2,578 | 71.0% | 6.5% |
| Period 1 of 2026-27 | 2,930 | 82.2% | 2.9% |
| Period 13 of 2025-26 | 2,810 | 81.9% | 2.0% |
| Period 12 of 2025-26 | 2,414 | 78.3% | 3.9% |
| Period 11 of 2025-26 | 2,587 | 77.3% | 3.0% |
| Period 10 of 2025-26 | 2,440 | 66.7% | 3.7% |
| Period 9 of 2025-26 | 2,520 | 67.7% | 2.3% |
| Period 8 of 2025-26 | 1,556 | 77.9% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fleet | 33,142 | 79.6% | 3.3% |
| Haddenham and Thame Parkway | 32,175 | 85.2% | 1.0% |
| Ore | 33,914 | 80.9% | 9.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out