Gloucester
GCRSouth WestManaged by Great Western Railway
How this station is performing
Gloucester had 58,465 scheduled stops to Period 7 of 2026-27, about 161 a day. 72.0% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Gloucester opened on 4 November 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Gloucester is the oldest; the next oldest, Cheltenham Spa, dates from 1840.
Gloucester is remote: its nearest neighbours are Cheltenham Spa (10.1 km east), Stroud (Gloucs) (13.5 km south), Stonehouse (13.6 km south), Ashchurch for Tewkesbury (17.3 km north-east) and Cam and Dursley (18.4 km south-west). Of the five, Cam and Dursley is the most punctual at 75.0% and Ashchurch for Tewkesbury the least at 61.1%, with Gloucester on 72.0%.
Gloucester takes its name from a big city called Gloucester, home to about 145,563 people, and the station stands 0.5 km from its centre.
3 operators call at Gloucester: Great Western Railway (73.0%, 61% of stops), CrossCountry (68.9%, 20% of stops) and Transport for Wales (72.1%, 18% of stops). They are close together, with Great Western Railway leading on 73.0% and CrossCountry trailing on 68.9%, a gap of 4.1 percentage points.
Compared with 3 stations of a similar size in South West, Gloucester is the most punctual, at 72.0%. The comparison group includes Newton Abbot (71.8%), Salisbury (72.0%) and Bath Spa (68.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 35,881 | 73.0% | 4.9% |
| CrossCountry | 11,977 | 68.9% | 11.9% |
| Transport for Wales | 10,607 | 72.1% | 5.7% |
Operators with their own page for this station are linked to it.
Late train at Gloucester? Delay Repay
These operators call at Gloucester and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,481 | 67.5% | 6.4% |
| Period 6 of 2026-27 | 4,391 | 66.8% | 9.2% |
| Period 5 of 2026-27 | 4,139 | 66.0% | 9.3% |
| Period 4 of 2026-27 | 4,337 | 69.4% | 7.8% |
| Period 3 of 2026-27 | 4,645 | 70.8% | 7.8% |
| Period 2 of 2026-27 | 4,699 | 70.5% | 6.7% |
| Period 1 of 2026-27 | 5,041 | 78.0% | 3.2% |
| Period 13 of 2025-26 | 4,883 | 76.9% | 3.3% |
| Period 12 of 2025-26 | 4,478 | 79.2% | 3.8% |
| Period 11 of 2025-26 | 4,462 | 80.7% | 3.5% |
| Period 10 of 2025-26 | 4,033 | 73.1% | 9.0% |
| Period 9 of 2025-26 | 4,448 | 63.9% | 9.4% |
| Period 8 of 2025-26 | 4,428 | 70.5% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Newton Abbot | 58,484 | 71.8% | 4.3% |
| Salisbury | 57,872 | 72.0% | 2.9% |
| Bath Spa | 57,295 | 68.5% | 3.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out