Transport for Wales had 10,607 scheduled stops at Gloucester in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 72.1% of recorded arrivals came within three minutes and 5.7% of stops were cancelled.
Transport for Wales trains at Gloucester also serve Cheltenham Spa (10.1 km east, 69.1% on time, 7.8% cancelled), Lydney (26.2 km south-west, 65.8% on time, 3.8% cancelled), Hereford (38.9 km north-west, 71.5% on time, 2.2% cancelled), Chepstow (38.9 km south-west, 68.6% on time, 3.5% cancelled), Caldicot (47.6 km south-west, 69.5% on time, 3.4% cancelled) and Severn Tunnel Junction (48.5 km south-west, 70.5% on time, 3.4% cancelled), which are the stations on its network closest to Gloucester.
The busiest Transport for Wales station within 30 km of Gloucester is Lydney, 26.2 km south-west, with about 29 scheduled stops a day.
Transport for Wales ranks 2nd of the 3 operators with enough records at Gloucester, on 72.1%.
For Transport for Wales, Gloucester is the 177th best of 228 ranked stations. Its 72.1% here is 12.9 percentage points below the 85.0% across the whole network.
Over three full railway years Transport for Wales at Gloucester has improved each time, from 58.8% within three minutes in 2023-24 to 67.8% in 2024-25 and 76.1% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 830 | 58.4% | 5.1% |
| Period 6 of 2026-27 | 751 | 69.3% | 9.5% |
| Period 5 of 2026-27 | 697 | 55.0% | 18.1% |
| Period 4 of 2026-27 | 702 | 65.9% | 9.3% |
| Period 3 of 2026-27 | 838 | 74.6% | 3.9% |
| Period 2 of 2026-27 | 836 | 69.0% | 5.5% |
| Period 1 of 2026-27 | 957 | 78.6% | 3.3% |
| Period 13 of 2025-26 | 907 | 79.4% | 2.4% |
| Period 12 of 2025-26 | 837 | 80.6% | 3.1% |
| Period 11 of 2025-26 | 828 | 84.7% | 2.2% |
| Period 10 of 2025-26 | 756 | 71.1% | 4.9% |
| Period 9 of 2025-26 | 839 | 65.8% | 7.7% |
| Period 8 of 2025-26 | 829 | 75.2% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gloucester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 35,881 | 73.0% | 4.9% |
| CrossCountry | 11,977 | 68.9% | 11.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out