CrossCountry at Gloucester
All trains at GloucesterCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 11,977 scheduled stops at Gloucester in the 13 periods to Period 7 of 2026-27, 20% of the station's total. 68.9% of recorded arrivals came within three minutes and 11.9% of stops were cancelled.
CrossCountry trains at Gloucester also serve Cheltenham Spa (10.1 km east, 60.3% on time, 6.8% cancelled), Ashchurch for Tewkesbury (17.3 km north-east, 55.8% on time, 9.3% cancelled), Lydney (26.2 km south-west, 74.7% on time, 13.3% cancelled), Worcestershire Parkway (32.8 km north, 62.1% on time, 7.8% cancelled), Worcester Shrub Hill (36.7 km north, – on time, – cancelled) and Yate (38.4 km south, – on time, – cancelled), which are the stations on its network closest to Gloucester.
The busiest CrossCountry station within 30 km of Gloucester is Cheltenham Spa, 10.1 km east, with about 84 scheduled stops a day.
Of the 3 operators with enough records at Gloucester, CrossCountry is the least punctual, at 68.9%.
CrossCountry at Gloucester has slipped sharply. 68.9% of stops came within three minutes of the timetable in the latest 13 periods, 5.2 percentage points worse than the 74.1% recorded in the 13 before. Cancellations held steady at 11.9% of scheduled stops, against 11.9% before.
Over three full railway years CrossCountry at Gloucester has improved each time, from 64.3% within three minutes in 2023-24 to 68.7% in 2024-25 and 74.0% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 942 | 58.8% | 13.2% |
| Period 6 of 2026-27 | 925 | 62.6% | 14.4% |
| Period 5 of 2026-27 | 782 | 60.9% | 9.3% |
| Period 4 of 2026-27 | 924 | 65.8% | 12.1% |
| Period 3 of 2026-27 | 826 | 69.3% | 12.3% |
| Period 2 of 2026-27 | 924 | 68.8% | 17.9% |
| Period 1 of 2026-27 | 1,169 | 74.8% | 6.4% |
| Period 13 of 2025-26 | 1,010 | 73.8% | 6.6% |
| Period 12 of 2025-26 | 924 | 75.2% | 5.7% |
| Period 11 of 2025-26 | 917 | 81.0% | 7.6% |
| Period 10 of 2025-26 | 832 | 71.1% | 22.2% |
| Period 9 of 2025-26 | 916 | 60.6% | 18.8% |
| Period 8 of 2025-26 | 886 | 67.8% | 10.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gloucester
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 35,881 | 73.0% | 4.9% |
| Transport for Wales | 10,607 | 72.1% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out