Bath Spa had 57,295 scheduled stops to Period 7 of 2026-27, about 157 a day. 68.5% of recorded arrivals were within three minutes of the timetable and 3.8% of scheduled stops were cancelled.
Bath Spa opened on 31 August 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bath Spa is the oldest; the next oldest, Keynsham, dates from 1840.
The nearest stations to Bath Spa are Oldfield Park (1.6 km west), Freshford (5.6 km south-east), Avoncliff (6.7 km south-east), Bradford-on-Avon (8.1 km south-east) and Keynsham (10.7 km north-west). 4 stations lie within 10 km in all. At 68.5%, Bath Spa is less punctual than all of them; the best of the five, Avoncliff, manages 77.6%.
Bath Spa is named after Bath, a city of United Kingdom, home to about 94,092 people, but the station stands 0.5 km from its centre.
Bath Spa has slipped a little, from 73.3% within three minutes in the previous 13 periods to 68.5% in the latest 13, a fall of 4.8 percentage points. Cancellations held steady at 3.8% of scheduled stops, against 3.9% before.
Compared with 3 stations of a similar size in South West, Bath Spa is the least punctual, at 68.5%. All of them are ahead, including Salisbury (72.0%), Gloucester (72.0%) and Newton Abbot (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 57,295 | 68.5% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Bath Spa? Delay Repay
These operators call at Bath Spa and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,605 | 68.1% | 3.3% |
| Period 6 of 2026-27 | 4,548 | 66.0% | 3.0% |
| Period 5 of 2026-27 | 4,484 | 59.1% | 5.2% |
| Period 4 of 2026-27 | 4,627 | 57.5% | 5.4% |
| Period 3 of 2026-27 | 4,506 | 68.0% | 7.3% |
| Period 2 of 2026-27 | 4,354 | 66.7% | 4.8% |
| Period 1 of 2026-27 | 4,751 | 77.6% | 2.0% |
| Period 13 of 2025-26 | 4,628 | 77.1% | 2.7% |
| Period 12 of 2025-26 | 4,230 | 81.6% | 1.2% |
| Period 11 of 2025-26 | 4,299 | 76.3% | 2.8% |
| Period 10 of 2025-26 | 3,940 | 66.0% | 4.6% |
| Period 9 of 2025-26 | 4,302 | 57.7% | 3.7% |
| Period 8 of 2025-26 | 4,021 | 67.5% | 3.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Salisbury | 57,872 | 72.0% | 2.9% |
| Gloucester | 58,465 | 72.0% | 6.4% |
| Newton Abbot | 58,484 | 71.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out