Ardlui
AUIScotlandManaged by ScotRail
How this station is performing
Ardlui had 4,669 scheduled stops to Period 7 of 2026-27, about 13 a day. 60.8% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Ardlui opened on 7 August 1894, 132 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Ardlui is the newest; the oldest, Tyndrum Lower, opened in 1873.
Ardlui is remote: its nearest neighbours are Arrochar and Tarbet (11.0 km south), Crianlarich (11.7 km north-east), Tyndrum Lower (14.6 km north), Upper Tyndrum (14.8 km north) and Dalmally (19.5 km north-west). Of the five, Dalmally is the most punctual at 78.2% and Arrochar and Tarbet the least at 55.6%, with Ardlui on 60.8%.
Ardlui takes its name from a Village called Ardlui, and the station stands 0.2 km from its centre.
Ardlui is among the least punctual stations in Britain. Its 60.8% within three minutes places it 2317th of 2,374, with 2,316 stations doing better and 57 doing worse. The national median is 83.9%, which is 23.1 percentage points higher.
Compared with 3 stations of a similar size in Scotland, Ardlui is the most punctual, at 60.8%. The comparison group includes Arrochar and Tarbet (55.6%), Garelochhead (58.6%) and Helensburgh Upper (58.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 4,388 | 60.9% | 0.8% |
| Caledonian Sleeper | 281 | – | – |
Operators with their own page for this station are linked to it.
Late train at Ardlui? Delay Repay
These operators call at Ardlui and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 364 | 52.2% | 0.5% |
| Period 6 of 2026-27 | 366 | 62.8% | 1.4% |
| Period 5 of 2026-27 | 368 | 63.4% | 0.3% |
| Period 4 of 2026-27 | 366 | 54.0% | 0.5% |
| Period 3 of 2026-27 | 365 | 55.7% | 1.1% |
| Period 2 of 2026-27 | 368 | 57.3% | 0.0% |
| Period 1 of 2026-27 | 422 | 65.4% | 0.5% |
| Period 13 of 2025-26 | 402 | 62.9% | 1.0% |
| Period 12 of 2025-26 | 356 | 69.1% | 0.3% |
| Period 11 of 2025-26 | 346 | 64.4% | 2.3% |
| Period 10 of 2025-26 | 245 | 67.2% | 0.4% |
| Period 9 of 2025-26 | 344 | 57.3% | 2.0% |
| Period 8 of 2025-26 | 357 | 59.7% | 0.8% |
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Arrochar and Tarbet | 4,668 | 55.6% | 0.9% |
| Garelochhead | 4,668 | 58.6% | 0.9% |
| Helensburgh Upper | 4,668 | 58.2% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out