ScotRail at Garelochhead
How this operator is doing here
ScotRail had 4,387 scheduled stops at Garelochhead in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 58.3% of recorded arrivals came within three minutes and 0.8% of stops were cancelled.
ScotRail trains at Garelochhead also serve Helensburgh Upper (9.6 km south-east, 58.2% on time, 0.8% cancelled), Helensburgh Central (10.3 km south-east, 84.9% on time, 2.7% cancelled), Craigendoran (11.8 km south-east, 88.1% on time, 2.8% cancelled), Gourock (13.2 km south, 92.3% on time, 1.2% cancelled), Fort Matilda (13.6 km south, 93.9% on time, 1.2% cancelled) and Arrochar and Tarbet (15.1 km north-east, 55.7% on time, 0.8% cancelled), which are the stations on its network closest to Garelochhead.
Within 30 km of here, ScotRail runs best at Inverkip, 19.6 km south (97.4%), and worst at Arrochar and Tarbet, 15.1 km north-east (55.7%).
The busiest ScotRail station within 30 km of Garelochhead is Dumbarton Central, 21.9 km south-east, with about 148 scheduled stops a day.
Of the 1 operators with enough records at Garelochhead, ScotRail is the most punctual, at 58.3%.
Over three full railway years ScotRail at Garelochhead has improved each time, from 51.0% within three minutes in 2023-24 to 52.4% in 2024-25 and 58.6% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 341 | 56.9% | 0.0% |
| Period 6 of 2026-27 | 344 | 61.8% | 1.5% |
| Period 5 of 2026-27 | 344 | 58.9% | 0.3% |
| Period 4 of 2026-27 | 342 | 51.2% | 0.9% |
| Period 3 of 2026-27 | 344 | 56.3% | 1.2% |
| Period 2 of 2026-27 | 344 | 55.2% | 0.0% |
| Period 1 of 2026-27 | 394 | 63.4% | 0.3% |
| Period 13 of 2025-26 | 376 | 64.7% | 1.1% |
| Period 12 of 2025-26 | 336 | 69.8% | 0.3% |
| Period 11 of 2025-26 | 333 | 53.1% | 2.1% |
| Period 10 of 2025-26 | 229 | 62.0% | 0.0% |
| Period 9 of 2025-26 | 326 | 49.2% | 2.1% |
| Period 8 of 2025-26 | 334 | 54.1% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Garelochhead
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 281 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out