Tain
TAIScotlandManaged by ScotRail
How this station is performing
Tain had 4,592 scheduled stops to Period 7 of 2026-27, about 13 a day. 83.2% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Tain opened on 1 June 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Invergordon is the oldest (1863) and Golspie the newest (1868), with Tain in between.
The nearest stations to Tain are Fearn (5.3 km south-east), Invergordon (15.7 km south-west), Alness (17.8 km south-west), Golspie (17.8 km north) and Ardgay (19.8 km west). 1 stations lie within 10 km in all. Of the five, Invergordon is the most punctual at 84.8% and Ardgay the least at 82.1%, with Tain on 83.2%.
Tain takes its name from a Village called Tain, home to about 3,590 people, and the station stands 0.4 km from its centre.
Tain improved sharply over the past year. In the latest 13 periods 83.2% of stops came within three minutes of the timetable, up 11.3 percentage points from 71.9% in the 13 before. Cancellations held steady at 2.7% of scheduled stops, against 2.9% before.
Compared with 3 stations of a similar size in Scotland, Tain is the most punctual, at 83.2%. The comparison group includes Arrochar and Tarbet (55.6%), Garelochhead (58.6%) and Helensburgh Upper (58.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 4,592 | 83.2% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Tain? Delay Repay
These operators call at Tain and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 375 | 79.6% | 2.1% |
| Period 6 of 2026-27 | 372 | 83.7% | 3.0% |
| Period 5 of 2026-27 | 374 | 88.7% | 2.9% |
| Period 4 of 2026-27 | 366 | 85.6% | 3.0% |
| Period 3 of 2026-27 | 101 | 86.1% | 0.0% |
| Period 2 of 2026-27 | 376 | 91.2% | 0.8% |
| Period 1 of 2026-27 | 431 | 89.4% | 1.2% |
| Period 13 of 2025-26 | 410 | 88.6% | 1.5% |
| Period 12 of 2025-26 | 376 | 90.4% | 2.7% |
| Period 11 of 2025-26 | 348 | 76.4% | 5.2% |
| Period 10 of 2025-26 | 316 | 83.0% | 5.1% |
| Period 9 of 2025-26 | 372 | 75.4% | 4.8% |
| Period 8 of 2025-26 | 375 | 63.7% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Arrochar and Tarbet | 4,668 | 55.6% | 0.9% |
| Garelochhead | 4,668 | 58.6% | 0.9% |
| Helensburgh Upper | 4,668 | 58.2% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out