Elephant and Castle
EPHLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Elephant and Castle had 84,758 scheduled stops to Period 7 of 2026-27, about 233 a day. 85.6% of recorded arrivals were within three minutes of the timetable and 5.7% of scheduled stops were cancelled.
Elephant and Castle opened on 6 October 1862, 164 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Bridge is the oldest (1836) and London Blackfriars the newest (1886), with Elephant and Castle in between.
The nearest stations to Elephant and Castle are London Waterloo East (1.3 km north-west), London Waterloo (1.4 km north-west), London Bridge (1.5 km north-east), London Blackfriars (1.9 km north) and Vauxhall (1.9 km south-west). 143 stations lie within 10 km in all. Of the five, London Waterloo East is the most punctual at 85.8% and London Blackfriars the least at 80.5%, with Elephant and Castle on 85.6%.
2 operators call at Elephant and Castle: GTR (85.6%, 95% of stops) and Southeastern (86.0%, 5% of stops). They are close together, with Southeastern leading on 86.0% and GTR trailing on 85.6%, a gap of 0.4 percentage points.
Compared with 3 stations of a similar size in London, Elephant and Castle is the least punctual, at 85.6%. All of them are ahead, including Heathrow Terminal 5 (Rail Station Only) (91.2%), Blackheath (87.6%) and Battersea Park (94.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 80,597 | 85.6% | 5.8% |
| Southeastern | 4,161 | 86.0% | 2.5% |
Operators with their own page for this station are linked to it.
Late train at Elephant and Castle? Delay Repay
These operators call at Elephant and Castle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,674 | 83.4% | 3.8% |
| Period 6 of 2026-27 | 6,654 | 82.4% | 7.0% |
| Period 5 of 2026-27 | 8,059 | 81.8% | 6.5% |
| Period 4 of 2026-27 | 6,861 | 86.4% | 4.2% |
| Period 3 of 2026-27 | 5,786 | 84.7% | 7.0% |
| Period 2 of 2026-27 | 5,695 | 88.4% | 4.8% |
| Period 1 of 2026-27 | 7,082 | 89.6% | 3.8% |
| Period 13 of 2025-26 | 7,067 | 89.7% | 4.6% |
| Period 12 of 2025-26 | 6,719 | 88.4% | 4.1% |
| Period 11 of 2025-26 | 6,542 | 85.3% | 5.5% |
| Period 10 of 2025-26 | 4,586 | 85.6% | 9.9% |
| Period 9 of 2025-26 | 6,540 | 83.0% | 9.4% |
| Period 8 of 2025-26 | 6,493 | 84.6% | 4.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Heathrow Terminal 5 (Rail Station Only) | 81,940 | 91.2% | 5.1% |
| Blackheath | 88,957 | 87.6% | 1.8% |
| Battersea Park | 80,708 | 94.1% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out