Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

GTR at Elephant and Castle

All trains at Elephant and CastleGTR across BritainLondon

On time, last 13 periods85.6%Whole station: 85.6%
Cancelled5.8%Whole station: 5.7%
Scheduled stops80,597Of 84,758 at the station

How this operator is doing here

GTR had 80,597 scheduled stops at Elephant and Castle in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 85.6% of recorded arrivals came within three minutes and 5.8% of stops were cancelled.

GTR trains at Elephant and Castle also serve London Bridge (1.5 km north-east, 83.8% on time, 3.9% cancelled), London Blackfriars (1.9 km north, 80.4% on time, 5.4% cancelled), City Thameslink (2.4 km north, 77.2% on time, 5.8% cancelled), Moorgate (2.8 km north, 89.1% on time, 4.9% cancelled), Farringdon (2.9 km north, 79.6% on time, 5.9% cancelled) and Denmark Hill (2.9 km south, 86.8% on time, 4.0% cancelled), which are the stations on its network closest to Elephant and Castle.

Within 30 km of here, GTR runs best at Birkbeck, 10.5 km south (98.1%), and worst at Kenley, 18.8 km south (66.9%).

The busiest GTR station within 30 km of Elephant and Castle is East Croydon, 13.2 km south, with about 813 scheduled stops a day.

Of the 2 operators with enough records at Elephant and Castle, GTR is the least punctual, at 85.6%.

For GTR, Elephant and Castle is the 117th best of 307 ranked stations. Its 85.6% here is 2.7 percentage points above the 82.9% across the whole network.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 93.2%Period 2 of 2023-24: 92.9%Period 3 of 2023-24: 88.9%Period 4 of 2023-24: 94.1%Period 5 of 2023-24: 93.0%Period 6 of 2023-24: 91.0%Period 7 of 2023-24: 91.4%Period 8 of 2023-24: 89.2%Period 9 of 2023-24: 86.7%Period 10 of 2023-24: 85.2%Period 11 of 2023-24: 85.2%Period 12 of 2023-24: 90.0%Period 13 of 2023-24: 89.9%Period 1 of 2024-25: 90.1%Period 2 of 2024-25: 88.8%Period 3 of 2024-25: 88.5%Period 4 of 2024-25: 87.0%Period 5 of 2024-25: 88.7%Period 6 of 2024-25: 89.6%Period 7 of 2024-25: 85.3%Period 8 of 2024-25: 85.6%Period 9 of 2024-25: 81.0%Period 10 of 2024-25: 85.2%Period 11 of 2024-25: 86.1%Period 12 of 2024-25: 89.9%Period 13 of 2024-25: 89.4%Period 1 of 2025-26: 89.6%Period 2 of 2025-26: 90.0%Period 3 of 2025-26: 87.6%Period 4 of 2025-26: 88.5%Period 5 of 2025-26: 88.5%Period 6 of 2025-26: 86.1%Period 7 of 2025-26: 87.6%Period 8 of 2025-26: 84.7%Period 9 of 2025-26: 83.1%Period 10 of 2025-26: 85.6%Period 11 of 2025-26: 85.2%Period 12 of 2025-26: 88.2%Period 13 of 2025-26: 89.7%Period 1 of 2026-27: 89.6%Period 2 of 2026-27: 88.5%Period 3 of 2026-27: 84.8%Period 4 of 2026-27: 86.1%Period 5 of 2026-27: 81.3%Period 6 of 2026-27: 82.1%Period 7 of 2026-27: 83.4%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 4.3%Period 2 of 2023-24: 2.5%Period 3 of 2023-24: 5.6%Period 4 of 2023-24: 5.2%Period 5 of 2023-24: 3.7%Period 6 of 2023-24: 4.0%Period 7 of 2023-24: 5.4%Period 8 of 2023-24: 3.7%Period 9 of 2023-24: 6.2%Period 10 of 2023-24: 10.1%Period 11 of 2023-24: 3.9%Period 12 of 2023-24: 2.2%Period 13 of 2023-24: 4.8%Period 1 of 2024-25: 6.8%Period 2 of 2024-25: 4.8%Period 3 of 2024-25: 4.7%Period 4 of 2024-25: 5.6%Period 5 of 2024-25: 5.4%Period 6 of 2024-25: 5.9%Period 7 of 2024-25: 8.2%Period 8 of 2024-25: 7.0%Period 9 of 2024-25: 12.1%Period 10 of 2024-25: 10.5%Period 11 of 2024-25: 3.6%Period 12 of 2024-25: 5.8%Period 13 of 2024-25: 5.5%Period 1 of 2025-26: 4.3%Period 2 of 2025-26: 2.7%Period 3 of 2025-26: 6.2%Period 4 of 2025-26: 6.0%Period 5 of 2025-26: 8.8%Period 6 of 2025-26: 6.9%Period 7 of 2025-26: 6.9%Period 8 of 2025-26: 4.4%Period 9 of 2025-26: 9.7%Period 10 of 2025-26: 10.1%Period 11 of 2025-26: 5.6%Period 12 of 2025-26: 4.2%Period 13 of 2025-26: 4.6%Period 1 of 2026-27: 3.9%Period 2 of 2026-27: 4.8%Period 3 of 2026-27: 7.0%Period 4 of 2026-27: 4.4%Period 5 of 2026-27: 7.4%Period 6 of 2026-27: 7.2%Period 7 of 2026-27: 3.9%2023-242024-252025-262026-27

See how GTR Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-276,43483.4%3.9%
Period 6 of 2026-276,35882.1%7.2%
Period 5 of 2026-276,42881.3%7.4%
Period 4 of 2026-276,49086.1%4.4%
Period 3 of 2026-275,54584.8%7.0%
Period 2 of 2026-275,51588.5%4.8%
Period 1 of 2026-276,91489.6%3.9%
Period 13 of 2025-266,89189.7%4.6%
Period 12 of 2025-266,49188.2%4.2%
Period 11 of 2025-266,38285.2%5.6%
Period 10 of 2025-264,50685.6%10.1%
Period 9 of 2025-266,31083.1%9.7%
Period 8 of 2025-266,33384.7%4.4%

Time of year

75%80%85%90%95%P1: 90.6%1P2: 90.0%2P3: 87.5%3P4: 88.8%4P5: 87.8%5P6: 87.1%6P7: 86.8%7P8: 86.5%8P9: 83.5%9P10: 85.3%10P11: 85.5%11P12: 89.3%12P13: 89.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Elephant and Castle

OperatorScheduled stopsWithin 3 minCancelled
Southeastern4,16186.0%2.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out