Blackheath
BKHLondonManaged by Southeastern
How this station is performing
Blackheath had 88,957 scheduled stops to Period 7 of 2026-27, about 244 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Blackheath opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Blackheath is the oldest; the next oldest, Lewisham, dates from 1849.
The nearest stations to Blackheath are Kidbrooke (1.4 km east), Lewisham (1.5 km west), Hither Green (1.7 km south), Lee (London) (1.8 km south) and Maze Hill (1.9 km north). 117 stations lie within 10 km in all. Of the five, Maze Hill is the most punctual at 87.7% and Kidbrooke the least at 85.1%, with Blackheath on 87.6%.
Blackheath is one of 3 stations named after an area of London called Blackheath, home to about 26,914 people; this one stands 0.5 km from its centre.
2 operators call at Blackheath: Southeastern (87.6%, 100% of stops) and GTR (91.6%, 0% of stops). They are close together, with GTR leading on 91.6% and Southeastern trailing on 87.6%, a gap of 4.0 percentage points.
2 of 3 stations of a similar size in London are more punctual than Blackheath on 87.6%. The comparison group includes London Marylebone (88.6%), Twickenham (87.8%) and Elephant and Castle (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 88,570 | 87.6% | 1.8% |
| GTR | 387 | 91.6% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Blackheath? Delay Repay
These operators call at Blackheath and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,626 | 88.1% | 1.2% |
| Period 6 of 2026-27 | 6,867 | 86.5% | 1.0% |
| Period 5 of 2026-27 | 6,494 | 86.6% | 2.4% |
| Period 4 of 2026-27 | 7,072 | 87.5% | 1.4% |
| Period 3 of 2026-27 | 7,155 | 85.5% | 3.0% |
| Period 2 of 2026-27 | 6,658 | 86.4% | 4.3% |
| Period 1 of 2026-27 | 8,038 | 90.2% | 1.7% |
| Period 13 of 2025-26 | 6,985 | 89.0% | 1.6% |
| Period 12 of 2025-26 | 7,278 | 88.7% | 1.4% |
| Period 11 of 2025-26 | 6,486 | 88.8% | 1.0% |
| Period 10 of 2025-26 | 5,515 | 89.6% | 1.5% |
| Period 9 of 2025-26 | 7,035 | 86.6% | 1.3% |
| Period 8 of 2025-26 | 6,748 | 85.7% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Marylebone | 91,131 | 88.6% | 1.3% |
| Twickenham | 92,760 | 87.8% | 2.9% |
| Elephant and Castle | 84,758 | 85.6% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out