Southeastern at Elephant and Castle
All trains at Elephant and CastleSoutheastern across BritainLondon
How this operator is doing here
Southeastern had 4,161 scheduled stops at Elephant and Castle in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 86.0% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Southeastern trains at Elephant and Castle also serve London Waterloo East (1.3 km north-west, 85.8% on time, 2.4% cancelled), London Bridge (1.5 km north-east, 82.8% on time, 1.6% cancelled), London Blackfriars (1.9 km north, 86.9% on time, 2.9% cancelled), London Cannon Street (1.9 km north, 89.3% on time, 1.6% cancelled), London Charing Cross (2.3 km north-west, 84.9% on time, 2.4% cancelled) and Denmark Hill (2.9 km south, 83.8% on time, 2.3% cancelled), which are the stations on its network closest to Elephant and Castle.
Within 30 km of here, Southeastern runs best at Sundridge Park, 12.2 km south-east (99.4%), and worst at London St Pancras International, 4.7 km north-west (77.9%).
The busiest Southeastern station within 30 km of Elephant and Castle is London Bridge, 1.5 km north-east, with about 912 scheduled stops a day.
Southeastern at Elephant and Castle has slipped sharply. 86.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 91.3% recorded in the 13 before. Cancellations held steady at 2.5% of scheduled stops, against 2.6% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 240 | 83.2% | 0.8% |
| Period 6 of 2026-27 | 296 | 88.2% | 2.4% |
| Period 5 of 2026-27 | 1,631 | 83.9% | 2.6% |
| Period 4 of 2026-27 | 371 | 91.8% | 1.6% |
| Period 3 of 2026-27 | 241 | 81.9% | 5.8% |
| Period 2 of 2026-27 | 180 | 86.5% | 5.6% |
| Period 1 of 2026-27 | 168 | 89.9% | 0.0% |
| Period 13 of 2025-26 | 176 | 92.4% | 3.4% |
| Period 12 of 2025-26 | 228 | 93.3% | 2.2% |
| Period 11 of 2025-26 | 160 | 89.2% | 1.9% |
| Period 10 of 2025-26 | 80 | 82.1% | 2.5% |
| Period 9 of 2025-26 | 230 | 81.9% | 1.3% |
| Period 8 of 2025-26 | 160 | 81.8% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Elephant and Castle
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 80,597 | 85.6% | 5.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out