Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

West Midlands Railway at Dorridge

All trains at DorridgeWest Midlands Railway across BritainWest Midlands

On time, last 13 periods88.4%Whole station: 85.5%
Cancelled4.1%Whole station: 2.6%
Scheduled stops21,873Of 46,056 at the station

How this operator is doing here

West Midlands Railway had 21,873 scheduled stops at Dorridge in the 13 periods to Period 7 of 2026-27, 47% of the station's total. 88.4% of recorded arrivals came within three minutes and 4.1% of stops were cancelled.

West Midlands Railway trains at Dorridge also serve Widney Manor (3.0 km north-west, 90.1% on time, 4.5% cancelled), Lapworth (3.8 km south-east, 87.6% on time, 4.7% cancelled), Solihull (5.3 km north-west, 90.2% on time, 4.5% cancelled), The Lakes (Warks) (6.4 km west, 83.9% on time, 3.6% cancelled), Wood End (6.9 km south-west, 84.4% on time, 3.5% cancelled) and Danzey (7.0 km south-west, 85.4% on time, 3.5% cancelled), which are the stations on its network closest to Dorridge.

Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 28.0 km west (100.0%), and worst at Tamworth, 29.9 km north (43.1%).

The busiest West Midlands Railway station within 30 km of Dorridge is Birmingham New Street, 15.4 km north-west, with about 532 scheduled stops a day.

Of the 2 operators with enough records at Dorridge, West Midlands Railway is the most punctual, at 88.4%.

For West Midlands Railway, Dorridge is the 47th best of 169 ranked stations. Its 88.4% here is 7.3 percentage points above the 81.1% across the whole network.

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2023-24: 87.6%Period 2 of 2023-24: 89.2%Period 3 of 2023-24: 91.2%Period 4 of 2023-24: 91.7%Period 5 of 2023-24: 91.2%Period 6 of 2023-24: 88.5%Period 7 of 2023-24: 88.0%Period 8 of 2023-24: 85.9%Period 9 of 2023-24: 81.3%Period 10 of 2023-24: 87.9%Period 11 of 2023-24: 91.0%Period 12 of 2023-24: 90.7%Period 13 of 2023-24: 91.5%Period 1 of 2024-25: 93.3%Period 2 of 2024-25: 90.3%Period 3 of 2024-25: 92.6%Period 4 of 2024-25: 91.3%Period 5 of 2024-25: 89.7%Period 6 of 2024-25: 91.7%Period 7 of 2024-25: 89.8%Period 8 of 2024-25: 88.1%Period 9 of 2024-25: 83.2%Period 10 of 2024-25: 87.1%Period 11 of 2024-25: 91.6%Period 12 of 2024-25: 93.3%Period 13 of 2024-25: 92.6%Period 1 of 2025-26: 93.5%Period 2 of 2025-26: 91.2%Period 3 of 2025-26: 91.4%Period 4 of 2025-26: 87.0%Period 5 of 2025-26: 86.7%Period 6 of 2025-26: 89.6%Period 7 of 2025-26: 92.2%Period 8 of 2025-26: 87.1%Period 9 of 2025-26: 87.2%Period 10 of 2025-26: 90.0%Period 11 of 2025-26: 92.1%Period 12 of 2025-26: 92.5%Period 13 of 2025-26: 91.3%Period 1 of 2026-27: 90.5%Period 2 of 2026-27: 87.1%Period 3 of 2026-27: 86.6%Period 4 of 2026-27: 84.6%Period 5 of 2026-27: 84.8%Period 6 of 2026-27: 88.7%Period 7 of 2026-27: 85.0%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 4.3%Period 2 of 2023-24: 3.3%Period 3 of 2023-24: 3.9%Period 4 of 2023-24: 3.9%Period 5 of 2023-24: 10.4%Period 6 of 2023-24: 5.4%Period 7 of 2023-24: 6.7%Period 8 of 2023-24: 5.4%Period 9 of 2023-24: 7.5%Period 10 of 2023-24: 9.2%Period 11 of 2023-24: 1.2%Period 12 of 2023-24: 4.1%Period 13 of 2023-24: 4.3%Period 1 of 2024-25: 3.5%Period 2 of 2024-25: 3.5%Period 3 of 2024-25: 3.7%Period 4 of 2024-25: 2.8%Period 5 of 2024-25: 9.5%Period 6 of 2024-25: 5.8%Period 7 of 2024-25: 6.8%Period 8 of 2024-25: 4.4%Period 9 of 2024-25: 6.4%Period 10 of 2024-25: 5.4%Period 11 of 2024-25: 4.3%Period 12 of 2024-25: 1.4%Period 13 of 2024-25: 2.0%Period 1 of 2025-26: 2.9%Period 2 of 2025-26: 2.3%Period 3 of 2025-26: 2.7%Period 4 of 2025-26: 5.7%Period 5 of 2025-26: 3.0%Period 6 of 2025-26: 2.9%Period 7 of 2025-26: 1.2%Period 8 of 2025-26: 5.3%Period 9 of 2025-26: 4.0%Period 10 of 2025-26: 3.9%Period 11 of 2025-26: 4.5%Period 12 of 2025-26: 1.8%Period 13 of 2025-26: 4.7%Period 1 of 2026-27: 3.7%Period 2 of 2026-27: 3.6%Period 3 of 2026-27: 3.5%Period 4 of 2026-27: 5.4%Period 5 of 2026-27: 8.6%Period 6 of 2026-27: 3.4%Period 7 of 2026-27: 2.2%2023-242024-252025-262026-27

See how West Midlands Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,70885.0%2.2%
Period 6 of 2026-271,70888.7%3.4%
Period 5 of 2026-271,46584.8%8.6%
Period 4 of 2026-271,57284.6%5.4%
Period 3 of 2026-271,67686.6%3.5%
Period 2 of 2026-271,57487.1%3.6%
Period 1 of 2026-271,97890.5%3.7%
Period 13 of 2025-261,86591.3%4.7%
Period 12 of 2025-261,70892.5%1.8%
Period 11 of 2025-261,67992.1%4.5%
Period 10 of 2025-261,52590.0%3.9%
Period 9 of 2025-261,70887.2%4.0%
Period 8 of 2025-261,70787.1%5.3%

Time of year

75%80%85%90%95%P1: 91.1%1P2: 89.5%2P3: 90.4%3P4: 88.7%4P5: 88.1%5P6: 89.6%6P7: 88.8%7P8: 87.0%8P9: 84.0%9P10: 88.3%10P11: 91.6%11P12: 92.2%12P13: 91.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Dorridge

OperatorScheduled stopsWithin 3 minCancelled
Chiltern Railways24,18283.0%1.2%
CrossCountry1––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out