Solihull
SOLWest MidlandsManaged by Chiltern Railways
How this station is performing
Solihull had 46,026 scheduled stops to Period 7 of 2026-27, about 126 a day. 87.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Solihull opened on 1 October 1852, 174 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Solihull is the oldest; the next oldest, Acocks Green, dates from 1852.
The nearest stations to Solihull are Widney Manor (2.3 km south-east), Olton (2.9 km north), Shirley (4.0 km west), Acocks Green (4.4 km north-west) and Yardley Wood (4.5 km west). 26 stations lie within 10 km in all. At 87.3%, Solihull is less punctual than all of them; the best of the five, Widney Manor, manages 90.1%.
Solihull takes its name from a big city called Solihull, home to about 206,674 people, and the station stands 1.2 km from its centre.
2 operators call at Solihull: Chiltern Railways (84.8%, 53% of stops) and West Midlands Railway (90.2%, 47% of stops). The operator you travel with matters: West Midlands Railway reaches 90.2% within three minutes while Chiltern Railways manages 84.8%, a gap of 5.4 percentage points.
Compared with 3 stations of a similar size in West Midlands, Solihull is the most punctual, at 87.3%. The comparison group includes Dorridge (85.5%), Lichfield Trent Valley (67.3%) and Erdington (81.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 24,256 | 84.8% | 1.2% |
| West Midlands Railway | 21,770 | 90.2% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Solihull? Delay Repay
These operators call at Solihull and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,570 | 84.9% | 1.5% |
| Period 6 of 2026-27 | 3,535 | 85.4% | 2.2% |
| Period 5 of 2026-27 | 3,170 | 82.3% | 4.9% |
| Period 4 of 2026-27 | 3,411 | 82.4% | 3.9% |
| Period 3 of 2026-27 | 3,449 | 84.6% | 2.4% |
| Period 2 of 2026-27 | 3,477 | 86.3% | 2.4% |
| Period 1 of 2026-27 | 4,124 | 90.7% | 2.2% |
| Period 13 of 2025-26 | 3,849 | 91.0% | 3.2% |
| Period 12 of 2025-26 | 3,541 | 92.2% | 1.3% |
| Period 11 of 2025-26 | 3,528 | 91.1% | 2.7% |
| Period 10 of 2025-26 | 3,239 | 88.7% | 2.2% |
| Period 9 of 2025-26 | 3,507 | 87.2% | 2.9% |
| Period 8 of 2025-26 | 3,626 | 86.1% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dorridge | 46,056 | 85.5% | 2.6% |
| Lichfield Trent Valley | 45,420 | 67.3% | 5.4% |
| Erdington | 46,978 | 81.9% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out