How this station is performing
Denmark Hill had 123,492 scheduled stops to Period 7 of 2026-27, about 339 a day. 88.4% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Denmark Hill opened on 1 October 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Brixton is the oldest (1862) and North Dulwich the newest (1868), with Denmark Hill in between.
The nearest stations to Denmark Hill are Loughborough Junction (0.9 km west), East Dulwich (1.0 km south-east), Peckham Rye (1.4 km east), North Dulwich (1.6 km south) and Brixton (1.8 km west). 133 stations lie within 10 km in all. Of the five, East Dulwich is the most punctual at 96.0% and Loughborough Junction the least at 83.2%, with Denmark Hill on 88.4%.
Denmark Hill takes its name from an area of London called Denmark Hill, and the station stands 0.0 km from its centre.
3 operators call at Denmark Hill: London Overground (93.4%, 40% of stops), Southeastern (83.8%, 33% of stops) and GTR (86.8%, 27% of stops). The operator you travel with matters: London Overground reaches 93.4% within three minutes while Southeastern manages 83.8%, a gap of 9.6 percentage points.
Compared with 3 stations of a similar size in London, Denmark Hill is the least punctual, at 88.4%. All of them are ahead, including New Cross (91.4%), West Croydon (90.8%) and London Cannon Street (89.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,636 | 93.4% | 4.5% |
| Southeastern | 41,095 | 83.8% | 2.3% |
| GTR | 32,761 | 86.8% | 4.0% |
Operators with their own page for this station are linked to it.
Late train at Denmark Hill? Delay Repay
These operators call at Denmark Hill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,511 | 87.4% | 2.9% |
| Period 6 of 2026-27 | 8,890 | 87.1% | 4.7% |
| Period 5 of 2026-27 | 9,888 | 86.5% | 5.2% |
| Period 4 of 2026-27 | 9,539 | 87.9% | 4.3% |
| Period 3 of 2026-27 | 9,571 | 86.2% | 3.1% |
| Period 2 of 2026-27 | 9,134 | 88.2% | 8.9% |
| Period 1 of 2026-27 | 11,194 | 93.1% | 2.6% |
| Period 13 of 2025-26 | 10,064 | 91.9% | 2.5% |
| Period 12 of 2025-26 | 9,602 | 92.0% | 1.9% |
| Period 11 of 2025-26 | 9,713 | 89.6% | 2.8% |
| Period 10 of 2025-26 | 7,122 | 88.0% | 3.2% |
| Period 9 of 2025-26 | 9,682 | 85.1% | 3.0% |
| Period 8 of 2025-26 | 9,582 | 85.5% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Cross | 124,287 | 91.4% | 3.3% |
| West Croydon | 125,004 | 90.8% | 4.6% |
| London Cannon Street | 120,575 | 89.3% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out