London Cannon Street
CSTLondonManaged by Network Rail
How this station is performing
London Cannon Street had 120,575 scheduled stops to Period 7 of 2026-27, about 331 a day. 89.3% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
London Cannon Street opened on 1 September 1866, 160 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, London Bridge is the oldest (1836) and City Thameslink the newest (1990), with London Cannon Street in between.
The nearest stations to London Cannon Street are London Bridge (0.7 km south-east), Moorgate (0.9 km north), London Blackfriars (0.9 km west), London Fenchurch Street (0.9 km east) and City Thameslink (1.0 km north-west). 141 stations lie within 10 km in all. At 89.3%, London Cannon Street is more punctual than every one of them; the best of the five, Moorgate, manages 89.1%.
London Cannon Street is named after London, a city, home to about 8,799,728 people, but the station stands 2.6 km from its centre.
1 of 3 stations of a similar size in London are more punctual than London Cannon Street on 89.3%. The comparison group includes Crystal Palace (93.8%), Seven Kings (88.4%) and Gidea Park (87.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 120,575 | 89.3% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at London Cannon Street? Delay Repay
These operators call at London Cannon Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,760 | 88.6% | 1.0% |
| Period 6 of 2026-27 | 9,600 | 89.2% | 1.2% |
| Period 5 of 2026-27 | 10,237 | 89.3% | 1.6% |
| Period 4 of 2026-27 | 9,747 | 89.5% | 1.5% |
| Period 3 of 2026-27 | 9,503 | 87.6% | 4.0% |
| Period 2 of 2026-27 | 8,119 | 90.9% | 2.1% |
| Period 1 of 2026-27 | 10,061 | 91.3% | 1.1% |
| Period 13 of 2025-26 | 10,010 | 90.5% | 1.4% |
| Period 12 of 2025-26 | 9,634 | 91.4% | 1.3% |
| Period 11 of 2025-26 | 8,689 | 89.9% | 1.0% |
| Period 10 of 2025-26 | 7,617 | 89.9% | 1.4% |
| Period 9 of 2025-26 | 9,180 | 85.8% | 1.2% |
| Period 8 of 2025-26 | 9,418 | 87.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crystal Palace | 119,274 | 93.8% | 3.5% |
| Seven Kings | 119,191 | 88.4% | 2.5% |
| Gidea Park | 118,902 | 87.9% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out