GTR at Denmark Hill
How this operator is doing here
GTR had 32,761 scheduled stops at Denmark Hill in the 13 periods to Period 7 of 2026-27, 27% of the station's total. 86.8% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
GTR trains at Denmark Hill also serve Loughborough Junction (0.9 km west, 82.9% on time, 8.3% cancelled), East Dulwich (1.0 km south-east, 96.0% on time, 2.6% cancelled), Peckham Rye (1.4 km east, 91.6% on time, 3.2% cancelled), North Dulwich (1.6 km south, 95.2% on time, 2.6% cancelled), Herne Hill (1.9 km south-west, 81.7% on time, 8.2% cancelled) and Queens Road (Peckham) (2.3 km east, 94.8% on time, 2.5% cancelled), which are the stations on its network closest to Denmark Hill.
Within 30 km of here, GTR runs best at Birkbeck, 7.5 km south (98.1%), and worst at Kenley, 16.0 km south (66.9%).
The busiest GTR station within 30 km of Denmark Hill is East Croydon, 10.3 km south, with about 813 scheduled stops a day.
GTR ranks 2nd of the 3 operators with enough records at Denmark Hill, on 86.8%.
For GTR, Denmark Hill is the 101st best of 307 ranked stations. Its 86.8% here is 3.9 percentage points above the 82.9% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,561 | 84.1% | 2.5% |
| Period 6 of 2026-27 | 2,568 | 85.0% | 4.6% |
| Period 5 of 2026-27 | 2,624 | 84.9% | 3.8% |
| Period 4 of 2026-27 | 2,620 | 86.6% | 3.9% |
| Period 3 of 2026-27 | 2,375 | 87.3% | 5.1% |
| Period 2 of 2026-27 | 2,311 | 89.2% | 6.8% |
| Period 1 of 2026-27 | 2,877 | 92.6% | 1.3% |
| Period 13 of 2025-26 | 2,793 | 90.0% | 3.0% |
| Period 12 of 2025-26 | 2,560 | 89.6% | 2.7% |
| Period 11 of 2025-26 | 2,596 | 87.7% | 2.7% |
| Period 10 of 2025-26 | 1,762 | 85.7% | 6.6% |
| Period 9 of 2025-26 | 2,628 | 82.5% | 6.4% |
| Period 8 of 2025-26 | 2,486 | 82.3% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Denmark Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,636 | 93.4% | 4.5% |
| Southeastern | 41,095 | 83.8% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out