West Croydon
WCYLondonManaged by London Overground
How this station is performing
West Croydon had 125,004 scheduled stops to Period 7 of 2026-27, about 343 a day. 90.8% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
West Croydon opened on 5 June 1839, 187 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, West Croydon is the oldest; the next oldest, East Croydon, dates from 1841.
The nearest stations to West Croydon are East Croydon (0.7 km south-east), Waddon (1.6 km south-west), Selhurst (1.8 km north-east), South Croydon (1.8 km south) and Thornton Heath (2.3 km north). 86 stations lie within 10 km in all. Of the five, Thornton Heath is the most punctual at 93.4% and East Croydon the least at 77.5%, with West Croydon on 90.8%.
2 operators call at West Croydon: GTR (90.9%, 59% of stops) and London Overground (90.7%, 41% of stops). They are close together, with GTR leading on 90.9% and London Overground trailing on 90.7%, a gap of 0.2 percentage points.
1 of 3 stations of a similar size in London are more punctual than West Croydon on 90.8%. The comparison group includes New Cross (91.4%), Denmark Hill (88.4%) and Raynes Park (86.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 74,159 | 90.9% | 3.1% |
| London Overground | 50,845 | 90.7% | 6.8% |
Operators with their own page for this station are linked to it.
Late train at West Croydon? Delay Repay
These operators call at West Croydon and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,645 | 89.4% | 4.3% |
| Period 6 of 2026-27 | 9,208 | 89.9% | 4.6% |
| Period 5 of 2026-27 | 9,376 | 88.8% | 6.8% |
| Period 4 of 2026-27 | 9,429 | 90.5% | 7.7% |
| Period 3 of 2026-27 | 9,516 | 90.7% | 3.9% |
| Period 2 of 2026-27 | 9,473 | 91.4% | 3.6% |
| Period 1 of 2026-27 | 11,119 | 92.2% | 4.1% |
| Period 13 of 2025-26 | 10,285 | 91.9% | 3.6% |
| Period 12 of 2025-26 | 9,777 | 90.6% | 6.0% |
| Period 11 of 2025-26 | 9,428 | 88.4% | 4.8% |
| Period 10 of 2025-26 | 8,450 | 92.4% | 3.0% |
| Period 9 of 2025-26 | 9,710 | 91.6% | 3.5% |
| Period 8 of 2025-26 | 9,588 | 92.6% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| New Cross | 124,287 | 91.4% | 3.3% |
| Denmark Hill | 123,492 | 88.4% | 3.6% |
| Raynes Park | 126,805 | 86.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out