Southeastern at Denmark Hill
How this operator is doing here
Southeastern had 41,095 scheduled stops at Denmark Hill in the 13 periods to Period 7 of 2026-27, 33% of the station's total. 83.8% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Southeastern trains at Denmark Hill also serve Loughborough Junction (0.9 km west, 90.2% on time, 2.2% cancelled), Peckham Rye (1.4 km east, 81.3% on time, 2.0% cancelled), Brixton (1.8 km west, 84.3% on time, 2.8% cancelled), Herne Hill (1.9 km south-west, 80.8% on time, 2.4% cancelled), Nunhead (2.6 km east, 86.1% on time, 2.2% cancelled) and Elephant and Castle (2.9 km north, 86.0% on time, 2.5% cancelled), which are the stations on its network closest to Denmark Hill.
Within 30 km of here, Southeastern runs best at Sundridge Park, 9.8 km south-east (99.4%), and worst at Sevenoaks, 28.5 km south-east (72.3%).
The busiest Southeastern station within 30 km of Denmark Hill is London Bridge, 4.1 km north, with about 912 scheduled stops a day.
Southeastern at Denmark Hill has edged up: 83.8% of stops came within three minutes of the timetable in the latest 13 periods, 3.3 percentage points better than the 80.5% of the 13 before. Cancellations held steady at 2.3% of scheduled stops, against 2.4% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,104 | 83.6% | 1.4% |
| Period 6 of 2026-27 | 3,020 | 82.7% | 1.9% |
| Period 5 of 2026-27 | 3,322 | 80.2% | 3.0% |
| Period 4 of 2026-27 | 3,063 | 83.9% | 2.3% |
| Period 3 of 2026-27 | 3,201 | 81.1% | 2.4% |
| Period 2 of 2026-27 | 3,116 | 83.6% | 9.8% |
| Period 1 of 2026-27 | 3,752 | 91.2% | 1.3% |
| Period 13 of 2025-26 | 3,302 | 88.5% | 1.2% |
| Period 12 of 2025-26 | 3,171 | 89.2% | 1.0% |
| Period 11 of 2025-26 | 3,137 | 85.6% | 1.3% |
| Period 10 of 2025-26 | 2,395 | 82.2% | 1.9% |
| Period 9 of 2025-26 | 3,312 | 78.8% | 1.0% |
| Period 8 of 2025-26 | 3,200 | 77.6% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Denmark Hill
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,636 | 93.4% | 4.5% |
| GTR | 32,761 | 86.8% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out