Dawlish Warren
DWWSouth WestManaged by Great Western Railway
How this station is performing
Dawlish Warren had 20,773 scheduled stops to Period 7 of 2026-27, about 57 a day. 78.5% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Dawlish Warren opened on 1 August 1905. It was moved to the site it uses now on 23 September 1912. The First World War closed Dawlish Warren on 1 January 1917, and it reopened on 5 May 1919. Of the 5 stations nearest to it with a known opening date, Dawlish Warren is the newest; the oldest, Dawlish, opened in 1846.
The nearest stations to Dawlish Warren are Dawlish (2.5 km south-west), Starcross (3.2 km north), Exmouth (3.3 km north-east), Lympstone Village (5.6 km north) and Teignmouth (6.7 km south-west). 8 stations lie within 10 km in all. Of the five, Lympstone Village is the most punctual at 85.2% and Dawlish the least at 76.5%, with Dawlish Warren on 78.5%.
Dawlish Warren takes its name from a Village called Dawlish Warren, and the station stands 0.1 km from its centre.
2 of 3 stations of a similar size in South West are more punctual than Dawlish Warren on 78.5%. The comparison group includes Upwey (86.9%), Crediton (79.0%) and Camborne (67.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 20,768 | 78.5% | 2.7% |
| CrossCountry | 5 | – | – |
Operators with their own page for this station are linked to it.
Late train at Dawlish Warren? Delay Repay
These operators call at Dawlish Warren and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,582 | 83.2% | 1.7% |
| Period 6 of 2026-27 | 1,604 | 75.2% | 1.4% |
| Period 5 of 2026-27 | 1,603 | 68.9% | 2.2% |
| Period 4 of 2026-27 | 1,552 | 68.3% | 5.6% |
| Period 3 of 2026-27 | 1,591 | 76.1% | 3.2% |
| Period 2 of 2026-27 | 1,598 | 73.8% | 2.4% |
| Period 1 of 2026-27 | 1,827 | 83.7% | 0.8% |
| Period 13 of 2025-26 | 1,711 | 85.9% | 2.3% |
| Period 12 of 2025-26 | 1,539 | 89.7% | 0.5% |
| Period 11 of 2025-26 | 1,572 | 82.8% | 10.2% |
| Period 10 of 2025-26 | 1,421 | 80.0% | 1.5% |
| Period 9 of 2025-26 | 1,587 | 74.7% | 1.4% |
| Period 8 of 2025-26 | 1,586 | 76.8% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out