Upwey
UPWSouth WestManaged by South Western Railway
How this station is performing
Upwey had 20,973 scheduled stops to Period 7 of 2026-27, about 58 a day. 86.9% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Upwey opened on 21 June 1871. It was moved to the site it uses now on 19 April 1886. Of the 5 stations nearest to it with a known opening date, Upwey is the newest; the oldest, Dorchester South, opened in 1847.
The nearest stations to Upwey are Weymouth (3.7 km south), Dorchester South (7.0 km north), Dorchester West (7.2 km north), Moreton (Dorset) (12.3 km north-east) and Maiden Newton (16.4 km north-west). 3 stations lie within 10 km in all. At 86.9%, Upwey is more punctual than every one of them; the best of the five, Dorchester West, manages 79.7%.
Upwey takes its name from a Village called Upwey, and the station stands 2.4 km from its centre.
2 operators call at Upwey: South Western Railway (87.7%, 72% of stops) and Great Western Railway (84.6%, 28% of stops). They are close together, with South Western Railway leading on 87.7% and Great Western Railway trailing on 84.6%, a gap of 3.1 percentage points.
Compared with 3 stations of a similar size in South West, Upwey is the most punctual, at 86.9%. The comparison group includes Dawlish Warren (78.5%), Crediton (79.0%) and Camborne (67.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 15,011 | 87.7% | 5.9% |
| Great Western Railway | 5,962 | 84.6% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Upwey? Delay Repay
These operators call at Upwey and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,617 | 84.9% | 4.1% |
| Period 6 of 2026-27 | 1,620 | 90.5% | 2.5% |
| Period 5 of 2026-27 | 1,628 | 87.0% | 5.0% |
| Period 4 of 2026-27 | 1,621 | 83.1% | 5.4% |
| Period 3 of 2026-27 | 1,595 | 82.8% | 7.2% |
| Period 2 of 2026-27 | 1,618 | 85.2% | 6.5% |
| Period 1 of 2026-27 | 1,840 | 93.9% | 2.4% |
| Period 13 of 2025-26 | 1,651 | 90.5% | 4.2% |
| Period 12 of 2025-26 | 1,595 | 91.9% | 6.6% |
| Period 11 of 2025-26 | 1,556 | 89.0% | 7.1% |
| Period 10 of 2025-26 | 1,458 | 84.6% | 4.3% |
| Period 9 of 2025-26 | 1,594 | 82.3% | 7.2% |
| Period 8 of 2025-26 | 1,580 | 82.3% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Dawlish Warren | 20,773 | 78.5% | 2.7% |
| Crediton | 21,234 | 79.0% | 3.4% |
| Camborne | 21,280 | 67.3% | 6.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out