Great Western Railway had 20,768 scheduled stops at Dawlish Warren in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 78.5% of recorded arrivals came within three minutes and 2.7% of stops were cancelled.
Great Western Railway trains at Dawlish Warren also serve Dawlish (2.5 km south-west, 77.3% on time, 3.3% cancelled), Starcross (3.2 km north, 77.1% on time, 2.4% cancelled), Exmouth (3.3 km north-east, 83.8% on time, 2.9% cancelled), Lympstone Village (5.6 km north, 85.2% on time, 3.3% cancelled), Teignmouth (6.7 km south-west, 77.6% on time, 3.3% cancelled) and Lympstone Commando (7.1 km north, 74.0% on time, 3.5% cancelled), which are the stations on its network closest to Dawlish Warren.
Within 30 km of here, Great Western Railway runs best at Paignton, 20.1 km south-west (87.3%), and worst at Yeoford, 28.1 km north-west (55.2%).
The busiest Great Western Railway station within 30 km of Dawlish Warren is Exeter St David's, 16.1 km north-west, with about 223 scheduled stops a day.
Of the 1 operators with enough records at Dawlish Warren, Great Western Railway is the most punctual, at 78.5%.
Great Western Railway at Dawlish Warren has slipped a little, from 81.2% within three minutes in the previous 13 periods to 78.5% in the latest 13, a fall of 2.7 percentage points. Cancellations rose to 2.7% of scheduled stops from 2.2%, which is 0.5 percentage points more.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,582 | 83.2% | 1.7% |
| Period 6 of 2026-27 | 1,604 | 75.2% | 1.4% |
| Period 5 of 2026-27 | 1,598 | 69.0% | 2.2% |
| Period 4 of 2026-27 | 1,552 | 68.3% | 5.6% |
| Period 3 of 2026-27 | 1,591 | 76.1% | 3.2% |
| Period 2 of 2026-27 | 1,598 | 73.8% | 2.4% |
| Period 1 of 2026-27 | 1,827 | 83.7% | 0.8% |
| Period 13 of 2025-26 | 1,711 | 85.9% | 2.3% |
| Period 12 of 2025-26 | 1,539 | 89.7% | 0.5% |
| Period 11 of 2025-26 | 1,572 | 82.8% | 10.2% |
| Period 10 of 2025-26 | 1,421 | 80.0% | 1.5% |
| Period 9 of 2025-26 | 1,587 | 74.7% | 1.4% |
| Period 8 of 2025-26 | 1,586 | 76.8% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dawlish Warren
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 5 | – | – |