Camborne
CBNSouth WestManaged by Great Western Railway
How this station is performing
Camborne had 21,280 scheduled stops to Period 7 of 2026-27, about 58 a day. 67.3% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Camborne opened on 23 May 1843, 183 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Camborne is the oldest; the next oldest, Redruth, dates from 1843.
The nearest stations to Camborne are Redruth (5.7 km north-east), Hayle (9.1 km west), Lelant (10.3 km west), Lelant Saltings (10.8 km west) and St Erth (11.3 km south-west). 2 stations lie within 10 km in all. At 67.3%, Camborne is less punctual than all of them; the best of the five, Lelant Saltings, manages 97.8%.
Camborne takes its name from a town called Camborne, home to about 23,831 people, and the station stands 0.3 km from its centre.
2 operators call at Camborne: Great Western Railway (68.0%, 94% of stops) and CrossCountry (56.6%, 6% of stops). The operator you travel with matters: Great Western Railway reaches 68.0% within three minutes while CrossCountry manages 56.6%, a gap of 11.4 percentage points.
Compared with 3 stations of a similar size in South West, Camborne is the least punctual, at 67.3%. All of them are ahead, including Yate (77.5%), Crediton (79.0%) and Upwey (86.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 19,947 | 68.0% | 5.9% |
| CrossCountry | 1,333 | 56.6% | 12.9% |
Operators with their own page for this station are linked to it.
Late train at Camborne? Delay Repay
These operators call at Camborne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,555 | 76.2% | 3.0% |
| Period 6 of 2026-27 | 1,609 | 70.5% | 8.2% |
| Period 5 of 2026-27 | 1,655 | 57.5% | 11.7% |
| Period 4 of 2026-27 | 1,668 | 60.7% | 9.1% |
| Period 3 of 2026-27 | 1,655 | 65.8% | 8.2% |
| Period 2 of 2026-27 | 1,662 | 67.0% | 5.7% |
| Period 1 of 2026-27 | 1,901 | 75.0% | 2.7% |
| Period 13 of 2025-26 | 1,810 | 76.9% | 3.1% |
| Period 12 of 2025-26 | 1,643 | 63.7% | 2.7% |
| Period 11 of 2025-26 | 1,657 | 71.1% | 10.6% |
| Period 10 of 2025-26 | 1,476 | 63.6% | 8.3% |
| Period 9 of 2025-26 | 1,329 | 58.0% | 7.1% |
| Period 8 of 2025-26 | 1,660 | 64.2% | 3.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out