CrossCountry at Dawlish
How this operator is doing here
CrossCountry had 1,242 scheduled stops at Dawlish in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 52.2% of recorded arrivals came within three minutes and 17.3% of stops were cancelled.
CrossCountry trains at Dawlish also serve Dawlish Warren (2.5 km north-east, – on time, – cancelled), Teignmouth (4.2 km south-west, 55.4% on time, 17.2% cancelled), Newton Abbot (11.0 km south-west, 66.8% on time, 8.9% cancelled), Torquay (14.4 km south-west, 70.0% on time, 21.8% cancelled), Exeter St David's (17.4 km north, 66.9% on time, 7.3% cancelled) and Paignton (17.7 km south-west, 74.1% on time, 21.8% cancelled), which are the stations on its network closest to Dawlish.
Within 30 km of here, CrossCountry runs best at Totnes, 22.6 km south-west (69.0%), and worst at Newton Abbot, 11.0 km south-west (66.8%).
The busiest CrossCountry station within 30 km of Dawlish is Exeter St David's, 17.4 km north, with about 35 scheduled stops a day.
CrossCountry at Dawlish has slipped sharply. 52.2% of stops came within three minutes of the timetable in the latest 13 periods, 10.5 percentage points worse than the 62.7% recorded in the 13 before. Cancellations rose to 17.3% of scheduled stops from 11.0%, which is 6.3 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 86 | 56.7% | 22.1% |
| Period 6 of 2026-27 | 104 | 51.2% | 17.3% |
| Period 5 of 2026-27 | 101 | 39.5% | 24.8% |
| Period 4 of 2026-27 | 97 | 47.1% | 12.4% |
| Period 3 of 2026-27 | 92 | 49.4% | 9.8% |
| Period 2 of 2026-27 | 104 | 49.4% | 14.4% |
| Period 1 of 2026-27 | 110 | 55.8% | 5.5% |
| Period 13 of 2025-26 | 81 | 56.4% | 3.7% |
| Period 12 of 2025-26 | 74 | 65.2% | 6.8% |
| Period 11 of 2025-26 | 103 | 58.0% | 21.4% |
| Period 10 of 2025-26 | 88 | 52.5% | 33.0% |
| Period 9 of 2025-26 | 104 | 45.7% | 32.7% |
| Period 8 of 2025-26 | 98 | 52.5% | 18.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dawlish
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 33,141 | 77.3% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out