Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Dawlish

All trains at DawlishCrossCountry across BritainSouth West

On time, last 13 periods52.2%Whole station: 76.5%
Cancelled17.3%Whole station: 3.8%
Scheduled stops1,242Of 34,383 at the station

How this operator is doing here

CrossCountry had 1,242 scheduled stops at Dawlish in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 52.2% of recorded arrivals came within three minutes and 17.3% of stops were cancelled.

CrossCountry trains at Dawlish also serve Dawlish Warren (2.5 km north-east, – on time, – cancelled), Teignmouth (4.2 km south-west, 55.4% on time, 17.2% cancelled), Newton Abbot (11.0 km south-west, 66.8% on time, 8.9% cancelled), Torquay (14.4 km south-west, 70.0% on time, 21.8% cancelled), Exeter St David's (17.4 km north, 66.9% on time, 7.3% cancelled) and Paignton (17.7 km south-west, 74.1% on time, 21.8% cancelled), which are the stations on its network closest to Dawlish.

Within 30 km of here, CrossCountry runs best at Totnes, 22.6 km south-west (69.0%), and worst at Newton Abbot, 11.0 km south-west (66.8%).

The busiest CrossCountry station within 30 km of Dawlish is Exeter St David's, 17.4 km north, with about 35 scheduled stops a day.

CrossCountry at Dawlish has slipped sharply. 52.2% of stops came within three minutes of the timetable in the latest 13 periods, 10.5 percentage points worse than the 62.7% recorded in the 13 before. Cancellations rose to 17.3% of scheduled stops from 11.0%, which is 6.3 percentage points more.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 78.0%Period 2 of 2023-24: 68.4%Period 3 of 2023-24: 72.1%Period 4 of 2023-24: 76.3%Period 5 of 2023-24: 61.5%Period 6 of 2023-24: 60.8%Period 7 of 2023-24: 63.1%Period 8 of 2023-24: 63.8%Period 9 of 2023-24: 70.9%Period 10 of 2023-24: 70.6%Period 12 of 2023-24: 77.3%Period 13 of 2023-24: 60.0%Period 1 of 2024-25: 73.0%Period 2 of 2024-25: 63.6%Period 3 of 2024-25: 52.9%Period 4 of 2024-25: 57.1%Period 5 of 2024-25: 59.7%Period 9 of 2024-25: 59.5%Period 10 of 2024-25: 62.8%Period 11 of 2024-25: 68.8%Period 12 of 2024-25: 65.8%Period 13 of 2024-25: 78.6%Period 1 of 2025-26: 78.8%Period 2 of 2025-26: 62.3%Period 3 of 2025-26: 52.3%Period 4 of 2025-26: 50.5%Period 5 of 2025-26: 62.5%Period 6 of 2025-26: 51.2%Period 7 of 2025-26: 54.9%Period 8 of 2025-26: 52.5%Period 9 of 2025-26: 45.7%Period 10 of 2025-26: 52.5%Period 11 of 2025-26: 58.0%Period 12 of 2025-26: 65.2%Period 13 of 2025-26: 56.4%Period 1 of 2026-27: 55.8%Period 2 of 2026-27: 49.4%Period 3 of 2026-27: 49.4%Period 4 of 2026-27: 47.1%Period 5 of 2026-27: 39.5%Period 6 of 2026-27: 51.2%Period 7 of 2026-27: 56.7%
This pageGreat Britain
0%10%20%30%40%50%60%Period 1 of 2023-24: 10.7%Period 2 of 2023-24: 5.0%Period 3 of 2023-24: 33.7%Period 4 of 2023-24: 51.3%Period 5 of 2023-24: 17.0%Period 6 of 2023-24: 14.1%Period 7 of 2023-24: 7.1%Period 8 of 2023-24: 26.6%Period 9 of 2023-24: 45.0%Period 10 of 2023-24: 37.8%Period 12 of 2023-24: 7.4%Period 13 of 2023-24: 6.8%Period 1 of 2024-25: 12.5%Period 2 of 2024-25: 13.2%Period 3 of 2024-25: 13.3%Period 4 of 2024-25: 24.5%Period 5 of 2024-25: 11.1%Period 9 of 2024-25: 28.2%Period 10 of 2024-25: 11.4%Period 11 of 2024-25: 4.9%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 1.0%Period 1 of 2025-26: 12.2%Period 2 of 2025-26: 6.1%Period 3 of 2025-26: 15.4%Period 4 of 2025-26: 12.5%Period 5 of 2025-26: 7.7%Period 6 of 2025-26: 14.9%Period 7 of 2025-26: 12.8%Period 8 of 2025-26: 18.4%Period 9 of 2025-26: 32.7%Period 10 of 2025-26: 33.0%Period 11 of 2025-26: 21.4%Period 12 of 2025-26: 6.8%Period 13 of 2025-26: 3.7%Period 1 of 2026-27: 5.5%Period 2 of 2026-27: 14.4%Period 3 of 2026-27: 9.8%Period 4 of 2026-27: 12.4%Period 5 of 2026-27: 24.8%Period 6 of 2026-27: 17.3%Period 7 of 2026-27: 22.1%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-278656.7%22.1%
Period 6 of 2026-2710451.2%17.3%
Period 5 of 2026-2710139.5%24.8%
Period 4 of 2026-279747.1%12.4%
Period 3 of 2026-279249.4%9.8%
Period 2 of 2026-2710449.4%14.4%
Period 1 of 2026-2711055.8%5.5%
Period 13 of 2025-268156.4%3.7%
Period 12 of 2025-267465.2%6.8%
Period 11 of 2025-2610358.0%21.4%
Period 10 of 2025-268852.5%33.0%
Period 9 of 2025-2610445.7%32.7%
Period 8 of 2025-269852.5%18.4%

Time of year

50%60%70%80%90%P1: 69.5%1P2: 59.8%2P3: 55.5%3P4: 54.6%4P5: 56.2%5P6: 54.3%6P7: 58.0%7P8: 57.7%8P9: 57.8%9P10: 61.7%10P11: 63.9%11P12: 69.9%12P13: 66.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Dawlish

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway33,14177.3%3.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out