ScotRail at Cupar
How this operator is doing here
ScotRail had 19,887 scheduled stops at Cupar in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 76.8% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Cupar also serve Springfield (3.7 km south-west, 83.3% on time, 0.9% cancelled), Ladybank (8.4 km south-west, 82.3% on time, 1.1% cancelled), Leuchars (For St. Andrews) (9.6 km north-east, 76.5% on time, 1.0% cancelled), Leven (13.9 km south, 83.4% on time, 1.8% cancelled), Cameron Bridge (14.3 km south, 82.3% on time, 1.8% cancelled) and Markinch (15.0 km south-west, 80.2% on time, 1.1% cancelled), which are the stations on its network closest to Cupar.
Within 30 km of here, ScotRail runs best at Lochgelly, 27.7 km south-west (85.0%), and worst at Carnoustie, 27.7 km north-east (68.9%).
The busiest ScotRail station within 30 km of Cupar is Dundee, 15.7 km north, with about 124 scheduled stops a day.
Of the 2 operators with enough records at Cupar, ScotRail is the most punctual, at 76.8%.
For ScotRail, Cupar is the 282nd best of 312 ranked stations. Its 76.8% here is 11.1 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Cupar has improved each time, from 68.8% within three minutes in 2023-24 to 74.2% in 2024-25 and 77.8% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,532 | 70.8% | 1.2% |
| Period 6 of 2026-27 | 1,535 | 78.4% | 0.8% |
| Period 5 of 2026-27 | 1,538 | 71.4% | 1.7% |
| Period 4 of 2026-27 | 1,534 | 76.3% | 1.0% |
| Period 3 of 2026-27 | 1,533 | 81.7% | 1.2% |
| Period 2 of 2026-27 | 1,530 | 79.9% | 0.6% |
| Period 1 of 2026-27 | 1,766 | 81.3% | 0.6% |
| Period 13 of 2025-26 | 1,672 | 80.4% | 0.5% |
| Period 12 of 2025-26 | 1,528 | 74.8% | 0.6% |
| Period 11 of 2025-26 | 1,423 | 80.1% | 1.7% |
| Period 10 of 2025-26 | 1,321 | 75.0% | 1.0% |
| Period 9 of 2025-26 | 1,488 | 72.1% | 2.1% |
| Period 8 of 2025-26 | 1,487 | 75.2% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cupar
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 692 | 51.2% | 13.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out