Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

CrossCountry at Cupar

All trains at CuparCrossCountry across BritainScotland

On time, last 13 periods51.2%Whole station: 76.1%
Cancelled13.6%Whole station: 1.5%
Scheduled stops692Of 20,579 at the station

How this operator is doing here

CrossCountry had 692 scheduled stops at Cupar in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 51.2% of recorded arrivals came within three minutes and 13.6% of stops were cancelled.

CrossCountry trains at Cupar also serve Ladybank (8.4 km south-west, 49.4% on time, 13.6% cancelled), Leuchars (For St. Andrews) (9.6 km north-east, 54.3% on time, 13.6% cancelled), Markinch (15.0 km south-west, 47.1% on time, 13.6% cancelled), Dundee (15.7 km north, 66.8% on time, 13.5% cancelled), Kirkcaldy (24.8 km south-west, 48.0% on time, 13.6% cancelled) and Arbroath (37.3 km north-east, 73.7% on time, 10.6% cancelled), which are the stations on its network closest to Cupar.

The busiest CrossCountry station within 30 km of Cupar is Dundee, 15.7 km north, with about 4 scheduled stops a day.

Of the 2 operators with enough records at Cupar, CrossCountry is the least punctual, at 51.2%.

CrossCountry cancels more at Cupar than elsewhere: 13.6% of scheduled stops, against 5.9% across its network and 1.5% for every operator at the station.

CrossCountry at Cupar has slipped sharply. 51.2% of stops came within three minutes of the timetable in the latest 13 periods, 25.1 percentage points worse than the 76.3% recorded in the 13 before. Cancellations rose to 13.6% of scheduled stops from 9.8%, which is 3.8 percentage points more.

Period by period

40%60%80%2023-242024-252025-262026-27Period 13 of 2023-24: 60.7%Period 3 of 2024-25: 51.0%Period 4 of 2024-25: 52.1%Period 9 of 2024-25: 71.1%Period 12 of 2024-25: 85.2%Period 13 of 2024-25: 81.1%Period 2 of 2025-26: 69.8%Period 3 of 2025-26: 76.5%Period 4 of 2025-26: 72.5%Period 7 of 2025-26: 76.5%Period 9 of 2025-26: 42.3%Period 12 of 2025-26: 42.3%Period 13 of 2025-26: 55.2%Period 1 of 2026-27: 58.7%Period 2 of 2026-27: 65.1%Period 4 of 2026-27: 51.0%Period 5 of 2026-27: 44.2%Period 6 of 2026-27: 54.3%
This pageGreat Britain
0%10%20%30%Period 13 of 2023-24: 3.4%Period 3 of 2024-25: 12.5%Period 4 of 2024-25: 12.5%Period 9 of 2024-25: 19.6%Period 12 of 2024-25: 3.6%Period 13 of 2024-25: 11.7%Period 2 of 2025-26: 5.4%Period 3 of 2025-26: 8.9%Period 4 of 2025-26: 8.9%Period 7 of 2025-26: 10.5%Period 9 of 2025-26: 7.1%Period 12 of 2025-26: 7.1%Period 13 of 2025-26: 6.5%Period 1 of 2026-27: 28.1%Period 2 of 2026-27: 23.2%Period 4 of 2026-27: 10.7%Period 5 of 2026-27: 7.1%Period 6 of 2026-27: 17.9%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2740––
Period 6 of 2026-275654.3%17.9%
Period 5 of 2026-275644.2%7.1%
Period 4 of 2026-275651.0%10.7%
Period 3 of 2026-2750––
Period 2 of 2026-275665.1%23.2%
Period 1 of 2026-276458.7%28.1%
Period 13 of 2025-266255.2%6.5%
Period 12 of 2025-265642.3%7.1%
Period 11 of 2025-2638––
Period 10 of 2025-2648––
Period 9 of 2025-265642.3%7.1%
Period 8 of 2025-2654––

Other operators at Cupar

OperatorScheduled stopsWithin 3 minCancelled
ScotRail19,88776.8%1.1%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out