Cupar
CUPScotlandManaged by ScotRail
How this station is performing
Cupar had 20,579 scheduled stops to Period 7 of 2026-27, about 56 a day. 76.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Cupar opened on 20 September 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cupar is the oldest; the next oldest, Springfield, dates from 1847.
The nearest stations to Cupar are Springfield (3.7 km south-west), Ladybank (8.4 km south-west), Leuchars (For St. Andrews) (9.6 km north-east), Leven (13.9 km south) and Cameron Bridge (14.3 km south). 3 stations lie within 10 km in all. Of the five, Leven is the most punctual at 83.4% and Leuchars (For St. Andrews) the least at 74.1%, with Cupar on 76.1%.
Cupar takes its name from a town called Cupar, home to about 9,020 people, and the station stands 0.3 km from its centre.
2 operators call at Cupar: ScotRail (76.8%, 97% of stops) and CrossCountry (51.2%, 3% of stops). The operator you travel with matters: ScotRail reaches 76.8% within three minutes while CrossCountry manages 51.2%, a gap of 25.6 percentage points.
Compared with 3 stations of a similar size in Scotland, Cupar is the least punctual, at 76.1%. All of them are ahead, including Kintore (88.8%), Dyce (88.3%) and Inverurie (88.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 19,887 | 76.8% | 1.1% |
| CrossCountry | 692 | 51.2% | 13.6% |
Operators with their own page for this station are linked to it.
Late train at Cupar? Delay Repay
These operators call at Cupar and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,572 | 70.6% | 1.3% |
| Period 6 of 2026-27 | 1,591 | 77.7% | 1.4% |
| Period 5 of 2026-27 | 1,594 | 70.5% | 1.9% |
| Period 4 of 2026-27 | 1,590 | 75.5% | 1.3% |
| Period 3 of 2026-27 | 1,583 | 81.0% | 1.8% |
| Period 2 of 2026-27 | 1,586 | 79.5% | 1.4% |
| Period 1 of 2026-27 | 1,830 | 80.7% | 1.6% |
| Period 13 of 2025-26 | 1,734 | 79.5% | 0.7% |
| Period 12 of 2025-26 | 1,584 | 73.7% | 0.8% |
| Period 11 of 2025-26 | 1,461 | 79.6% | 2.0% |
| Period 10 of 2025-26 | 1,369 | 74.4% | 1.5% |
| Period 9 of 2025-26 | 1,544 | 71.1% | 2.3% |
| Period 8 of 2025-26 | 1,541 | 74.2% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out